Miami-Dade County, Florida
Milestone Inspection Repairs in Miami-Dade County
We take the engineer's report through to permit closeout, on a timeline the board can plan for.
In short
Who handles milestone inspection repairs in Miami-Dade?
SERPE-CO performs milestone inspection repairs in Miami-Dade County for condominium, cooperative and commercial owners after a Florida-registered engineer or architect has issued the building recertification report. The work involves pricing and permitting the engineer's scope, then building every concrete, balcony, railing and waterproofing repair it lists, so the engineer can confirm the building is safe for continued use.
Free milestone planner
Is a milestone inspection coming due on your building?
Enter the year your building got its certificate of occupancy and how many stories it has. The planner estimates your deadline under Florida law, then you can send it to SERPE-CO for a second look.
Add the year and story count for an estimated due date.
Want a second look at your timeline? Send your building details and SERPE-CO will follow up about the inspection, likely repairs and how to plan for them.
About this estimate
This is a planning estimate drawn from the statewide rule in Florida Statute 553.899. Your local building department sets the real deadline and may call for the first inspection at 25 years instead. Broward County also has its own Building Safety Inspection Program. Check your date with your building official and engineer, or contact SERPE-CO and we will help you sort it out.
Milestone & Recertification · Miami-Dade
Milestone inspection repairs in Miami-Dade County are the structural, waterproofing and building envelope repairs a licensed engineer or architect lists after inspecting a building under the county's building recertification program, Section 8-11(f) of the Code of Miami-Dade County. SERPE-CO is the contractor that performs those repairs. We do not perform the inspection. We take the report, price the engineer's scope, and build a phasing plan and schedule the board can approve, pull the permit and carry the work through to the engineer's sign-off.
Miami-Dade ran a recertification program long before the state did. After Florida passed SB 4-D in 2022, creating milestone inspections for condominium and cooperative buildings of three or more stories under Florida Statute 553.899, the county amended its ordinance and tied the two together. The county states that its program combines milestone phase one and phase two into a single inspection event, so a board deals with one report and one list of repairs.

Reviewed by Brett Serpe, MBA, GC, CEO of SERPE-CO · Florida Certified General Contractor CGC #1523974
Prepared by the SERPE-CO project team, with more than 20 years in concrete restoration. Last reviewed November 2026.


Local conditions
How building recertification works in Miami-Dade County
Under the amended ordinance, a building is recertified when it reaches 30 years of age and every 10 years after that. Condominium and cooperative buildings three stories and taller within three miles of the coastline are recertified at 25 years instead. Buildings that already went through the earlier 40-year program keep their established schedule, with the next recertification 10 years after the previous due date. Single-family homes, duplexes and minor buildings of 2,000 square feet or less with an occupant load of 10 or less are exempt.
The building official sends a Notice of Required Recertification, and the structural and electrical reports from a Florida-registered engineer or architect are due within 90 days. Threshold buildings are inspected by a structural engineer and an electrical engineer. The county allows an extension of up to 60 days to submit reports or obtain a repair permit, and up to 180 days to finish repairs under a valid permit when the design professional files an affidavit that the building can stay occupied.
Buildings that need this work
Which Miami-Dade buildings are working through recertification
Coastal condominium towers in Sunny Isles Beach, Bal Harbour, Surfside, Miami Beach and Key Biscayne fall under the 25-year rule for condominium and cooperative buildings three stories and taller within three miles of the coastline, and many have already been through several cycles. Reports on these buildings usually list balcony slab edges and railings, columns and beams at open parking levels, stair towers, roof slabs under equipment and the pool deck over the garage. Electrical findings appear in the same package and need a licensed electrical contractor.
Mainland buildings are part of the program too. Mid-rise condominiums on Biscayne Bay in Miami, Aventura and North Miami Beach, garden-style communities with open catwalks, office buildings in Coral Gables and Doral and warehouses near the airport are recertified on the county schedule unless an exemption applies. Reports on older low-rise communities often list catwalk and stair repairs, railing corrections and cracked stucco hiding spalled concrete. Parking lot lighting and guardrails beside water are checked as part of the same process.
The work
Milestone inspection repairs in Miami-Dade County: what the job covers
- 01Review of Phase 1 and Phase 2 engineering findings
- 02Engineer's scope priced, phased and scheduled for board approval
- 03Envelope, waterproofing and structural concrete repairs
- 04Permits and building department inspections
- 05Ongoing coordination with your engineer of record
- 06Project records for association files

Our approach
From the recertification report to a closed permit
We read the report alongside the engineer and walk the building to confirm every location and how each one will be reached. The board gets a written price for the engineer's scope, phased by elevation or area, the access method for each phase and a schedule. The county's guidance is that repairs should not begin until the reports are submitted and a permit is in hand, so the permit application and long-lead items such as railings move first.
During the work the engineer inspects exposed steel and each repair stage. Where the engineer has confirmed the building may stay occupied, we plan around that: protected entrances, balconies closed in phases and exits kept clear. At completion we hand the engineer the photo and quantity records needed to finish the recertification, and we close the permit with the city or with the county for unincorporated property.
SERPE-CO brings more than 20 years in the field to every job. Read about our full milestone & recertification service or browse all our work in Miami-Dade County.
Planning ahead
How a Miami-Dade board prepares before and after the report
A Miami-Dade board gains the most time by acting before the Notice of Required Recertification arrives. The county sends courtesy notices ahead of the due year, which gives an association room to hire its engineer early, have the building surveyed and learn the likely scope while there is still time to plan funding. Condominium buildings of three or more habitable stories also need a structural integrity reserve study under Florida law, repeated at least once a decade, and boards get the most from both documents when they compare them.
Once the report is issued, three tracks run together. The engineer prepares signed and sealed repair documents and quantities. The board arranges funding, which under most condominium documents means notices, meetings and votes. The contractor prepares the permit application and orders long-lead items such as railings. The engineer is required to report dangerous findings to the building official, and if repairs need more time, the design professional can request an extension of up to 180 days under a valid repair permit.
How we run a job
Site walk first, closed permit last.
- 01
Meet on site
Each job starts on site, walking the property and its conditions with your manager, board or engineer.
- 02
Follow the engineer's scope
The engineer writes the scope. We price it line by line, plan access and lay out each phase to build it.
- 03
Put safety first
We can never work too safely: shoring, swing stages, barricades and notices go up first.
- 04
Build the repairs
Crews work through the repairs in order, stopping for inspections wherever the engineer calls for them.
- 05
Finish and document
Final inspections, a closed permit and a full record of the work for the association.
Cities served
Milestone & Recertification throughout Miami-Dade County
Summary
What Miami-Dade boards and owners should remember
- 01
Coastal condominium and cooperative buildings three stories and taller in Miami-Dade are recertified at 25 years, most other buildings at 30.
- 02
The Miami-Dade program combines milestone phase one and phase two into a single inspection event.
- 03
Reports are due within 90 days of the Notice of Required Recertification, so an association should engage its engineer early.
- 04
Repairs should start only after the reports are submitted and a repair permit has been issued.
Questions
Milestone & Recertification in Miami-Dade: questions we hear
When is a condominium in Miami Beach or Sunny Isles Beach due for recertification?
Under the amended county ordinance, condominium and cooperative buildings three stories and taller within three miles of the coastline are recertified at 25 years, other buildings at 30 years, and both every 10 years after. Buildings already on the earlier 40-year schedule stay on it. The building official for your city sends the notice and confirms the date for your property.
Is the old 40-year recertification still used in Miami-Dade?
The first cycle is now 30 years, or 25 years for coastal condominium and cooperative buildings three stories and taller. Buildings that were already recertified under the 40-year program keep their schedule, and their next recertification is due 10 years after the previous due date. The building official confirms which schedule your building is on.
Does SERPE-CO perform recertification inspections in Miami-Dade?
No. The structural and electrical reports must come from a Florida-registered engineer or architect, and threshold buildings need a structural engineer and an electrical engineer. SERPE-CO is the contractor that carries out the repairs the reports call for. If your board has not engaged an engineer yet, we can coordinate with the one you choose.
Should a Sunny Isles Beach association hire the contractor before or after the engineer's report?
After the report is out, and without delay. Contractors can only price the same scope once the engineer's repair documents exist, so earlier proposals rarely line up. Before that point a contractor can still tour the building with the board and the engineer, raise access and phasing questions and point out long-lead items, so the permit follows the report quickly.
What do Miami-Dade recertification reports most often require?
Typical findings include spalling at balcony edges, catwalks, beams and columns, railings that are loose or below current code, deck coatings and membranes that have failed, cracked stucco, electrical corrections and parking lot lighting or guardrail items. Milestone inspection repairs in Miami-Dade County are defined building by building, and only the engineer's report says what your building needs and which items come first.
What happens if a Miami-Dade building is not recertified on time?
The county states that a property whose owner does not obtain recertification within the required time is referred to the Unsafe Structures Section, and an enforcement case is opened. Cities that run their own programs follow a similar path through their building official. Starting the engineer and the repair permit early is the best way to avoid it.
Laws and rules cited
- Miami-Dade County: Building Recertification (Milestone) Inspections, Code of Miami-Dade County Section 8-11(f)
- Miami-Dade County Product Control: Notice of Acceptance for building envelope products
- Florida Statute 553.899: mandatory structural inspections for condominium and cooperative buildings
- Florida Statute 718.112: structural integrity reserve studies
Treat this page as general information only, not legal or engineering advice. Licensed engineers and architects perform the inspections, and the building official decides which dates apply to your property. SERPE-CO's role is to carry out the repairs.
Working with an engineer?
Holding drawings, specifications or a complete set of bid documents?
Structural engineers, property engineers and board members send SERPE-CO much of our restoration, pool and roofing work. Once a scope has been drawn and specified, our team prices what the documents show, raises questions where something is unclear, and lays out each line so boards can weigh the bids on equal terms.
Request an estimate
Let's plan your restoration.
Tell us where the building is and what you are seeing. We set up a visit to the property, then send a written proposal, or tell you an engineer needs to write the scope first.