(954) 718-3094 Request an estimate

Featured projects

Our work on South Florida buildings.

Job photos from SERPE-CO crews, start to finish: pool decks, balconies, garages, columns and full exteriors on condominiums from St. Lucie to Miami-Dade.

12 projects

Featured restoration projects, start to finish.

These projects are condominium and commercial buildings SERPE-CO crews have restored from St. Lucie County to Miami-Dade County. Each gallery below follows one of our projects through the job photos: tear-out, rebar repair, new concrete, waterproofing and the finished building. Repairs on these projects were built to the repair drawings of the engineer of record, as every structural repair should be. Pick a project to jump to its photos, then see the matching services or read what boards ask in our FAQs. SERPE-CO holds Florida Certified General Contractor license CGC #1523974, which you can verify on the Florida DBPR license search.

Have a question about your building?Call the office or send a quick request. A real person answers.
01

Rooftop pool and pool deck restoration

Oceania IV

An elevated pool deck in Sunny Isles Beach taken down to the reinforced topping, rebuilt with new reinforcing, and finished with new pavers, turf and pool trim.

15 photos · start to finish
  1. 01

    The tower and its rooftop pool deck from above

  2. 02

    The pool drained before work commenced

  3. 03

    Crew patching up the pool deck

  4. 04

    Cracks marked and excavated in the pool walls

  5. 05

    Pool wall reinforcing exposed

  6. 06

    New rebar wading pool shell and reinforced topping slab

  7. 07

    Forming and pouring the wading pool

  8. 08

    Pouring concrete over the new deck reinforcing

  9. 09

    Wet cutting pavers on-site

  10. 10

    Setting and leveling the new pavers

  11. 11 Finished

    New pool deck installed

  12. 12 Finished

    Finished paver deck by the cabana

  13. 13

    Installing turf along the planter walls

  14. 14 Finished

    Pool edge, depth markers and ladder back in place

  15. 15 Finished

    New waterline tile on the pool wall

02

Balcony slab replacement on full scaffolding

The Glens

Balcony slabs removed and replaced on a mid-rise condominium, working from a full scaffold with doors and windows protected.

14 photos · start to finish
  1. 01

    Shoring and formwork set under a balcony

  2. 02

    New reinforcing tied over the forms with chairs

  3. 03

    Crew placing concrete into the balcony forms

  4. 04 Finished

    New elevated balcony slab after the pour

  5. 05

    Scaffolding rigging up onto the building

  6. 06

    Screeding a new balcony slab

  7. 07

    Demolition of an existing balcony

  8. 08

    Breaking out deteriorated concrete at the slab edge

  9. 09

    Strike-off on a new slab

  10. 10 Finished

    New balcony slab finished, doors still protected

  11. 11

    Crew working a pour under the scaffold

  12. 12

    New slab curing beside the scaffold

  13. 13

    Full scaffold on the building elevation

  14. 14 Finished

    The building with the scaffold down and completed

03

Balcony slab repair and railing reset

The River North

Small balcony slabs on two-story townhomes cut out, re-reinforced and recast, then the railings reset.

13 photos · start to finish
  1. 01

    Balcony slab removed, windows protected

  2. 02

    Railing still in and the slab opened up

  3. 03

    Shoring set below the balcony

  4. 04

    New reinforcing placed in the form

  5. 05

    Crew mixing structural concrete

  6. 06

    Sika 211 arriving on-site

  7. 07

    Working on the balcony

  8. 08

    Rolling scaffold set for demo

  9. 09

    Crew placing concrete from the scaffold

  10. 10

    Passing material up to the balcony

  11. 11

    Finishing the new slab edge

  12. 12

    Corroded railing missing fasteners

  13. 13 Finished

    Slab edge repaired with the railing reset and new fasteners in place

Ready for a site visit?Tell us where the building is and what you are seeing. We will set up a time to walk it.
04

Column and balcony repair from swing stages

2770 Building

Oceanfront high-rise repairs carried out from suspended swing stages, with ground-floor columns shored and rebuilt.

13 photos · start to finish
  1. 01

    Rigging the roof for the swing stages

  2. 02

    Outriggers set on the oceanfront parapet

  3. 03

    Swing stage staged at the ground floor

  4. 04

    SERPE-CO stage ready to go up

  5. 05

    Barricades and signage around the work zone

  6. 06

    Swing stage working the elevation

  7. 07

    Roof rigging for multiple drops

  8. 08

    Corroded column reinforcing exposed

  9. 09

    Shoring set and columns opened up

  10. 10

    Column formed for new concrete

  11. 11 Finished

    Column repaired and ready for finish

  12. 12

    Swing stage on the upper floors

  13. 13

    Balcony work in progress from the stage

05

Structural shoring, steel repair and walkway coating

Beach Villas

A coastal building shored from below while corroded steel joists were repaired, then balconies and walkways finished with a new coating.

11 photos · start to finish
  1. 01

    SERPE-CO truck and trailer on site

  2. 02

    Corrosion on the underside of the deck

  3. 03

    Shoring placed under the steel Hambro joists

  4. 04

    Ground floor cleared and laid out for shoring

  5. 05

    New bolted connections on the steel

  6. 06

    Joists shored and ready for repairs

  7. 07 Finished

    Finished balcony with new coating

  8. 08 Finished

    Second balcony coated and protected

  9. 09 Finished

    Walkway coating complete

  10. 10

    Corroded joists under the deck

  11. 11

    Shoring in place across the ground floor

06

Exterior restoration on full scaffolding

The Moorings

A mid-rise condominium restored from frame scaffolding, with the work zone fenced and signed and the garage shored below.

10 photos · start to finish
  1. 01

    Work zone fenced along the drive

  2. 02

    Site protection around the entrance

  3. 03

    Scaffold tower set at the roofline

  4. 04

    Scaffold tower on the front elevation

  5. 05

    Scaffold climbing the full height

  6. 06

    Crew setting scaffold frames

  7. 07

    Scaffold along the side elevation

  8. 08

    Scaffold outside of the garage

  9. 09

    Shoring set in the pool area

  10. 10

    Garage shoring and protected work area

07

Parking garage repair and traffic coating

Edgewater

Garage ceiling repairs on a beachfront high-rise, followed by a new traffic coating across the parking level.

11 photos · start to finish
  1. 01

    The building from the street

  2. 02

    Garage shoring and structural column drop panel additions underway

  3. 03

    Overhead forming of drop panel from the scaffold

  4. 04

    Reinforcing exposed in the drop panel reinforcement

  5. 05

    Rolling out the base coat

  6. 06

    Crew spreading coating across the floor

  7. 07

    Coating materials staged

  8. 08

    Edgewater from the front

  9. 09

    Textured traffic coating up close

  10. 10 Finished

    Parking level coated end to end

  11. 11 Finished

    Finished garage floor

Have a question about your building?Call the office or send a quick request. A real person answers.
08

Stair and walkway repair with new railings

Lighthouse Point Gardens

Concrete stairs and exterior walkways repaired on a two-story building, with old railings removed and new ones installed.

7 photos · start to finish
  1. 01

    SERPE-CO trucks on site

  2. 02

    Crew removing the old stair railing

  3. 03

    Old steel railings coming out along the stair

  4. 04 Finished

    Stair with new white aluminum railing installed

  5. 05

    Stair treads repaired behind safety tape

  6. 06

    Column chased for repair at the block wall

  7. 07

    Walkway shored with repairs underway

09

Structural concrete and rebar repair

Old Port Cove, Harbor Village

Balcony slabs and beams opened up on scaffolding to expose corroded reinforcing, then repaired and rebuilt.

9 photos · start to finish
  1. 01

    Site set up and staged

  2. 02

    Scaffold on the front of the building

  3. 03

    Equipment trailer and materials on site

  4. 04

    Crew at work under the scaffold

  5. 05

    Scaffold across the building

  6. 06

    Damaged slab and beam opened up

  7. 07

    Corroded reinforcing exposed

  8. 08

    New reinforcing placed in the form

  9. 09

    Welding at the slab edge

Request an estimate

Let's plan your restoration.

Tell us where the building is and what you are seeing. We set up a visit to the property, then send a written proposal, or tell you an engineer needs to write the scope first.

  • More than 20 years in the field
  • St. Lucie, Martin, Palm Beach, Broward and Miami-Dade
  • Family-owned Certified General Contractor

Rather call?(954) 718-3094

Work needed (choose all that apply)
Call Request an estimate