What steps take a condominium board from an engineer's report to a contract?
Most condo boards start with a licensed engineer, who converts the milestone or structural findings into drawings and specifications. Several contractors then bid on that same set. The board lines the proposals up item by item, checks each bidder's license, insurance, permits and timeline, and has its engineer and attorney review the contract before signing. The board alone decides on funding: reserves, special assessments or a loan.
Free milestone planner
Is a milestone inspection coming due on your building?
Enter the year your building got its certificate of occupancy and how many stories it has. The planner estimates your deadline under Florida law, then you can send it to SERPE-CO for a second look.
Add the year and story count for an estimated due date.
Want a second look at your timeline? Send your building details and SERPE-CO will follow up about the inspection, likely repairs and how to plan for them.
About this estimate
This is a planning estimate drawn from the statewide rule in Florida Statute 553.899. Your local building department sets the real deadline and may call for the first inspection at 25 years instead. Broward County also has its own Building Safety Inspection Program. Check your date with your building official and engineer, or contact SERPE-CO and we will help you sort it out.
The starting point
How condo boards get from a report to a signed contract
Restoration usually reaches condo boards on paper first: a report from a milestone inspection, a structural integrity reserve study, an engineer's letter after a spall or a leak, or a report from Broward's Building Safety Inspection program. The report describes the problems and how quickly they need attention, yet it is seldom a set of construction documents. What happens between that report and a signed contract decides whether bidding is fair, pricing is accurate and construction goes without surprises, so those steps deserve the same care as the repair itself.
Under Florida Statute 553.899, a milestone inspection ends with a sealed report from the inspecting engineer or architect to the association, including a summary of material findings and recommendations. Unit owners must receive that summary from the association within 45 days after it arrives. When a phase two report finds substantial structural deterioration, the local government sets a repair timeframe, and the statute says repairs must be commenced no later than 365 days after the association receives that report. The building official and the association's attorney can confirm which dates apply to your building.
First step
Start with an engineer who designs the repair
An engineer comes before the contractor. A licensed restoration or structural engineer takes a closer look at the building, sounds the slabs, marks where repairs go, and seals the drawings and specifications. Those documents describe the scope tightly enough for several contractors to price the same work. The engineer usually writes the bid form as well, answers bidder questions, reviews submittals, observes the work in progress and checks payment requests, so the board has an independent licensed professional working on its side of the table throughout the project.
Now and then condo boards ask a contractor to propose a repair with no drawings. For a small, clearly defined maintenance item that can make sense. For structural work, the board ends up holding proposals that each define the scope their own way, in their own language, with no independent judge of quantities or workmanship. SERPE-CO will gladly walk the building and share an honest opinion, but on structural repairs we encourage the board to get the engineer's documents first, and then we price them as written.

Second step
Fair bids on one set of documents
With drawings, specifications and the bid form ready, the manager or engineer asks a group of contractors to price that one set, usually after a joint site walk. All bidders see the same building, receive the same written addenda and price identical lines. Florida Statute 718.3026 requires a condominium association to obtain competitive bids for contracts worth more than a set percentage of its annual budget, and the statute also says the association does not have to accept the lowest bid. Homeowners' associations are governed by a separate chapter of Florida law.
Proposals are easier to compare when they follow one format. Put the unit prices for each repair type side by side, not only the totals, since restoration quantities nearly always shift once the concrete is opened. Look at what each bidder clarified or left out, how long the job will take, the number of crews and swing stages planned, and who will serve as superintendent. A bid with a low total that relies on low unit prices for small quantities, and high ones for the items likely to grow, can prove the costliest choice for the association.
Checking bidders
Questions on license, insurance, permits and schedule
Before the board signs, get each finalist's state license number and check it on the website of the Florida Department of Business and Professional Regulation. Request certificates of insurance for general liability and workers' compensation, naming the association the way the engineer and attorney require. Find out who pulls the permit, who books inspections, and how residents, cars and landscaping will be protected. Ask for a schedule broken out by phase or elevation, not a single finish date, and find out who will actually run the job. SERPE-CO holds CGC #1523974.
A sound contract lists the engineer's drawings, specifications and addenda with their dates, carries over the bid form unit prices, and explains how changes, retainage, payment applications and warranties will be handled. Engineers and association attorneys often have a preferred contract form of their own. SERPE-CO signs the documents the board's professionals prepare rather than swapping in terms of its own. None of this is legal advice, and the contract should go to the association's attorney for review before anyone on the board signs it.
While crews are on site
Phased work that lets residents stay home
On an occupied building, restoration is usually phased so residents can stay. Crews move by elevation, stack or garage bay, and a balcony is closed only during its own repair. Residents receive written notice before work reaches their unit, listing when railings come off, when the loud work happens and when the balcony must be cleared. Entrances get overhead protection, parking shifts in stages, and pool or amenity closures fall in the season the board prefers whenever the work allows. Safety is of the utmost importance in every phase.
Keeping people informed matters as much as the concrete. Early on, SERPE-CO and the manager settle the notice routine: what residents will be told, how much lead time they get, how the notice reaches them, and who fields their questions. The board gets regular updates on progress, measured quantities against the estimate, and next phases, tied to an organized schedule. If a surprise turns up inside a slab or beneath a tiled floor, our team and the engineer bring it to the board together, with the options and what each means for timing.
Funding the work
Reserves, assessments and the structural integrity reserve study
Under Florida Statute 718.112(2)(g), a residential condominium association with any building of three or more habitable stories must have a structural integrity reserve study done for that building no less than once every 10 years. Items covered include windows and exterior doors, waterproofing and exterior painting, plumbing, electrical systems, the roof, the structure, and fireproofing and fire protection systems, among others. A licensed engineer or architect, or a credentialed reserve specialist, must perform or verify the study, and its findings shape the reserve amounts in the budget.
Condo boards cover restoration costs with reserves, special assessments, borrowing through a loan or credit line, or a blend of these. The statute lets associations borrow to fund work that a milestone inspection or reserve study requires. Those decisions sit with the board and its manager, accountant and attorney. SERPE-CO can provide an early phasing plan and schedule of values, so the board can see roughly when each part of the contract will be billed and line up assessments or loan draws to match.
Checklist
What a board should ask each contractor
- 01Is the engineer's bid form priced exactly as issued?
- 02What did you clarify or exclude, and why?
- 03May we verify your license and insurance certificates?
- 04Who will act as superintendent on our building?
- 05Will the work be phased by elevation or stack?
- 06How will residents hear before work reaches their unit?
- 07How will quantities be tracked against the estimate?
- 08Who pulls the permit and books inspections?
Services involved
Repairs these documents tend to call for.
Summary
What condo boards should know
- 01
Condo boards get the fairest comparison when all contractors price one engineer's drawings, specifications and bid form.
- 02
Look past the total: weigh unit prices, exclusions, clarifications and schedules side by side.
- 03
Under Florida Statute 718.3026, condominium associations must get competitive bids for larger contracts, and need not accept the lowest bid.
- 04
With phasing by elevation or stack and written notice, most residents can stay home throughout.
- 05
The board and its professionals make funding decisions, guided by the structural integrity reserve study.
Questions
What condo boards ask before a project.
Can a board hire a contractor and skip the engineer?
On structural repairs, SERPE-CO advises against it. Without drawings and specifications from an engineer, each contractor writes its own scope, and nobody independent is there to compare the bids, check quantities or look at the steel before it gets covered. Small, clearly defined maintenance items are another matter, and a manager can often get proposals for those directly.
How many contractors should we ask to bid?
Enough for a real comparison without swamping the engineer. Many condo boards pick a shortlist of contractors that have worked on occupied buildings, then interview the strongest. Under Florida Statute 718.3026, larger condominium contracts need competitive bids, and the manager and the association's attorney can confirm how that rule applies to your building.
Why are restoration bids priced with unit prices?
No one knows exactly how much concrete has deteriorated until crews open the surface. For each repair type the engineer estimates a quantity, each contractor prices those as units, and the contract pays for quantities actually measured and verified. Unit prices give the board a fair way to compare bidders and show how the final contract amount moves if repairs grow or shrink.
Do residents need to move out during restoration?
Usually not. Work moves by stack, elevation or area, and each balcony closes only while under repair. Some repairs must be reached through a unit, for example a slab edge just behind a sliding glass door, and those need brief access windows arranged with the resident ahead of time. The engineer, the manager and SERPE-CO settle the phasing before work begins.
What is the engineer's role once construction begins?
Once crews mobilize, the engineer handles submittal review and field questions, inspects each repair location before it is covered, confirms quantities in payment requests and rules on any design change. The contractor carries out the work and handles crews, scheduling, safety and records. Separating those roles gives condo boards an outside check on what they pay for.
Can you help the board explain the project to owners?
Yes, within our role. SERPE-CO works closely with building associations and can help the board and engineer walk owners through the phasing, what they can expect to see and hear, and the way notices will be delivered. Ask us about joining an owners' meeting. Findings questions go to the engineer, while funding questions belong with the board and the professionals advising it.
Do HOAs follow the same rules as condominium associations?
Not always. Florida Statute 553.899 covers condominium and cooperative buildings with three or more habitable stories, while the reserve study rule in 718.112 is written for residential condominium associations. HOAs are governed by a separate chapter of Florida law plus their own governing documents. Which obligations apply is a question for the association's attorney, and an engineer-led bid process works the same way in either case.
Industry standards and guides
- International Concrete Repair Institute (ICRI): repair guidelines for concrete
- American Concrete Institute (ACI): codes and guides for concrete construction and repair
- Florida Building Code
- Florida Statute 553.899: mandatory structural inspections for condominium and cooperative buildings
On every project, our repair methods and materials follow the engineer's specification, the product maker's requirements and the current building code. Treat this page as general information, not engineering advice.
Request an estimate
Tell us about your building.
Tell us where the building is and what you are seeing. We set up a visit to the property, then send a written proposal, or tell you an engineer needs to write the scope first.