(954) 718-3094 Request an estimate

Engineers of record welcome

Working With Structural Engineers on Repairs

Your sealed drawings set the scope. Our crews carry out the concrete, waterproofing and roofing repairs they show, safely and on schedule.

In short

What is it like to work with SERPE-CO as the engineer of record?

SERPE-CO works closely with the professional engineers who design a repair. Structural engineers prepare the signed and sealed drawings and specifications, and our crews build what those documents show, priced on your bid form. Questions, product substitutions and changes go back to the engineer for a decision. Reinforcing steel stays exposed until the engineer has seen it, and our team keeps the board and the engineer informed as each location closes.

Free milestone planner

Is a milestone inspection coming due on your building?

Enter the year your building got its certificate of occupancy and how many stories it has. The planner estimates your deadline under Florida law, then you can send it to SERPE-CO for a second look.

Building type

Add the year and story count for an estimated due date.

About this estimate

This is a planning estimate drawn from the statewide rule in Florida Statute 553.899. Your local building department sets the real deadline and may call for the first inspection at 25 years instead. Broward County also has its own Building Safety Inspection Program. Check your date with your building official and engineer, or contact SERPE-CO and we will help you sort it out.

Your drawings

What structural engineers can count on from SERPE-CO

Concrete restoration along the coast, from St. Lucie County down to Miami-Dade, usually comes to SERPE-CO after structural engineers, property engineers or roof consultants have surveyed the building and drawn the repair. Their signed and sealed drawings and specifications form the contract, and building to them is our job. A family-run crew does not improvise a new repair detail on the scaffold, trade a specified product for whatever happens to be in stock, or push a marked location to a later phase without being told to.

Field conditions do not always match the drawings, and when they differ the engineer of record makes the call. A bar may have lost more section than the survey assumed, a delamination may spread beyond the marked outline, or a post-tensioned tendon may turn up in an unexpected spot. Our crew stops work at that location, takes photographs and measurements, and asks the engineer for written direction. Structural decisions stay with the licensed professional who sealed the design, and everyone on the project keeps a clean paper trail.

Your bid form

How SERPE-CO prices an engineer's bid form, line by line

Our estimate follows the engineer's bid form exactly, with no edits to its language. Where a repair is listed per unit, whether that is slab repair at partial or full depth, overhead and vertical work, beams and columns, rebar replacement, crack injection or pockets at railing posts, we give a unit price, which lets the association watch the total rise or fall as measured quantities replace the estimate. Allowances, lump sums and general conditions remain exactly where the form puts them, and we acknowledge every addendum.

Some documents can be read more than one way. Where that happens, our team lists a few short clarifications rather than hiding an assumption inside the price. Common ones cover how much tile comes up, who pays for testing, how shoring gets measured, and how crews reach occupied units. Exclusions are brief and written in plain language. The goal is a proposal the engineer can set beside the other bidders without picking up the phone, since everyone priced one scope on the same lines.

A pre-bid site walk is time well spent. SERPE-CO sends the people who would plan and supervise the job, and they look at access, staging areas, swing stage tie-backs, garage clearances and loads on the pool deck, plus anything the drawings cannot show. Anything we want to ask after the walk is sent in writing to the engineer before bids are due. The answers then reach every bidder through an addendum, not only the one who asked, which keeps the bidding fair for everyone involved.

Our superintendent walking a cracked slab edge with structural engineers before repairs

Before work starts

Submittals, RFIs, shop drawings and mockups

Ahead of mobilization, SERPE-CO sends the submittals your specification asks for. Typically that covers product data on coatings, sealants, membranes, corrosion inhibitors, bonding agents and repair mortars, each with its installation instructions and safety data sheet, plus shoring layouts and shop drawings where required for railings, expansion joints and other fabricated items. Each package is compared with the specification section behind it before it goes out, so the engineer reviews a complete submission the first time.

Each RFI is numbered, dated and tied to a specific sheet, detail or specification paragraph, with a suggested answer when our team has one. A substitution request carries the product data the engineer needs for a side-by-side comparison. When a mockup or test area is part of the specification, for example a coating system on a single balcony or one sample spall repair, our crew puts it in place early. That way the owner and engineer agree on what finished work should look like before it repeats across the building.

Have a question about your building?Call the office or send a quick request. A real person answers.

Hold points

The engineer inspects, and our crews wait for release

SERPE-CO is the contractor on these projects, never the inspector. In a typical repair, nothing gets placed until the engineer of record has seen the reinforcing steel exposed and cleaned, confirmed section loss and any bar replacement, and released the area. Our superintendent books those visits ahead and groups nearby locations, so a single trip clears as many repairs as it can, and each repair stays open until release. On bigger jobs the engineer may also watch chipping limits, shoring and pour preparation.

A lot of this work follows a milestone inspection under Florida Statute 553.899. That statute calls for a phase two inspection when phase one finds substantial structural deterioration, and it permits destructive or nondestructive testing as the inspector directs. For threshold buildings, which state law defines as taller than three stories or 50 feet, Florida Statute 553.79 calls for a special inspector whenever a repair or restoration project changes the structural system or its loading. Our team arranges site access for every inspector the permit names.

Keeping records

Quantities, photographs and changes in scope

Unit-price work only stays fair when everyone measures quantities the same way. SERPE-CO follows the measurement method in your specification, marking and measuring each repair location before removal and again after chipping, when its true size shows. Photographs taken along the way back up those numbers, and the engineer can ask at any point how a quantity in a payment application was counted. Ask us about the field records we keep on a project like yours, and our team will walk you through them before the bid.

Every change runs through the engineer. If a repair grows, a hidden condition turns up or the owner wants added scope, our team prices it using the unit rates already in the contract where they fit and sends it for the engineer's review before that work goes ahead. The one exception is an unsafe condition, which gets made safe right away, because on a SERPE-CO site we can never work too safely. Closeout documents are assembled in the order your specification lists them.

Our trades

Add SERPE-CO to your bidders list

SERPE-CO handles the range of work structural engineers specify on coastal buildings: concrete restoration and structural repair of slabs, columns and beams, balcony repairs and railings, parking garage repairs and traffic coatings, pool decks, pools and planters, painting and waterproofing, and roofing built to the consultant's specification. We are a family-owned Certified General Contractor, CGC #1523974, with more than 20 years in the field, working from St. Lucie County to Miami-Dade on occupied buildings where residents and cars stay put.

Building a bidders list for restoration, pool, garage or roofing work? Include us. Send the drawings and specifications, or a link to download them, using the form on this page, and add the bid date and the site walk details. SERPE-CO will confirm we received the set, tell you whether we plan to bid, and route our questions through you in writing. When a project is not a good fit, you hear that early, which leaves time to bring in another qualified bidder.

Checklist

What to include with your invitation to bid

  1. 01Repair drawings, signed and sealed
  2. 02Project manual or specifications
  3. 03Bid form showing estimated unit quantities
  4. 04All addenda issued so far
  5. 05Condition survey, photos and report
  6. 06Bid due date and site walk date
  7. 07Bonding and insurance requirements
  8. 08Owner contact and phasing limits
Ready for a site visit?Tell us where the building is and what you are seeing. We will set up a time to walk it.

Summary

What structural engineers should know

  • 01

    SERPE-CO builds to the signed and sealed drawings and specifications from the engineer of record, and sends field surprises back to the engineer for direction.

  • 02

    Bids are returned on your form with unit prices, a few clear clarifications and plain exclusions, so they compare easily with the other bidders.

  • 03

    Reinforcing steel stays exposed until the engineer inspects and releases each repair location.

  • 04

    Quantities follow the measurement method in your specification, so each payment application reconciles against the drawings.

  • 05

    Structural engineers are welcome to list us for restoration, garage, pool, waterproofing and roofing bids.

Questions

What structural engineers ask before a project.

Will you bid on documents from any engineering firm?

Yes. Most of our restoration bids are priced on documents from an independent engineer of record that the association or owner hired, and SERPE-CO does not need to have taken part in the survey or design. We price the set as issued, join the pre-bid walk when there is one, and route our questions to the engineer, so every bidder gets the same answers.

Do you ever propose other repair methods or products?

Yes, through the proper channel only. If our team sees a product or method that could match or beat the specified one, or shorten the schedule, we offer it on the form as a voluntary alternate, or send a substitution request, backed by product data for comparison. The base bid itself never strays from the documents, which keeps every bidder on one scope for the engineer.

What happens when unit-price quantities run over?

Quantities are measured the way your specification describes and reported against the estimate as the work moves along. When a line item starts to trend over, we flag it early to the owner and the engineer, while phasing or the budget can still be adjusted. SERPE-CO keeps the board informed throughout, and final quantities are reconciled location by location with the engineer before closeout.

Do you build to a roof consultant's specification?

Yes. On commercial roofing, the consultant's drawings and specification carry the same weight an engineer's documents carry on concrete work. SERPE-CO submits each component of the roofing system for review and coordinates the inspections the consultant and building official require. Ask us about the manufacturer's warranty requirements on your project, and our team will plan the installation around them.

Does SERPE-CO perform milestone inspections or condition surveys?

No. A licensed engineer or architect performs milestone inspections under Florida Statute 553.899, and the engineer of record prepares condition surveys and repair designs. SERPE-CO's role is to build the repairs. When the engineer wants exploratory openings, temporary shoring or access equipment for a survey, our crews can supply them, working under the engineer's direction.

What do you need from us before submittals begin?

Send the current conformed drawings and specifications, your submittal schedule if there is one, the format and transmittal route you prefer, and any products the specification names without alternates. From there our team sends complete submissions section by section and follows each item through review, resubmittal and approval, keeping you informed until every submittal is closed.

Do you handle garages and pools as well as high-rise towers?

Yes. Structural engineers send us parking garage repairs, plaza deck waterproofing, pool decks, pools and planters about as often as they send facade and balcony work. Every project gets priced and built in the same manner: to your drawings, location by location, with inspections held where your specification requires them and the closeout records kept organized.

Industry standards and guides

On every project, our repair methods and materials follow the engineer's specification, the product maker's requirements and the current building code. Treat this page as general information, not engineering advice.

Request an estimate

Tell us about your building.

Tell us where the building is and what you are seeing. We set up a visit to the property, then send a written proposal, or tell you an engineer needs to write the scope first.

  • More than 20 years in the field
  • St. Lucie, Martin, Palm Beach, Broward and Miami-Dade
  • Family-owned Certified General Contractor

Rather call?(954) 718-3094

Work needed (choose all that apply)
Call Request an estimate