We take the engineer's report through to permit closeout, on a timeline the board can plan for.
In short
Who handles milestone inspection repairs in Martin?
SERPE-CO handles milestone inspection repairs in Martin County for condominium and cooperative boards whose engineer or architect has finished the milestone report. We permit the scope the report sets out, build the concrete, balcony, railing and waterproofing repairs in the order the engineer specifies, and supply the photos and records the engineer needs to report that the work is complete.
Free milestone planner
Is a milestone inspection coming due on your building?
Enter the year your building got its certificate of occupancy and how many stories it has. The planner estimates your deadline under Florida law, then you can send it to SERPE-CO for a second look.
Add the year and story count for an estimated due date.
Want a second look at your timeline? Send your building details and SERPE-CO will follow up about the inspection, likely repairs and how to plan for them.
About this estimate
This is a planning estimate drawn from the statewide rule in Florida Statute 553.899. Your local building department sets the real deadline and may call for the first inspection at 25 years instead. Broward County also has its own Building Safety Inspection Program. Check your date with your building official and engineer, or contact SERPE-CO and we will help you sort it out.
Milestone & Recertification · Martin
Milestone inspection repairs in Martin County start with a report. Under Florida Statute 553.899, a licensed architect or engineer inspects each condominium or co-op building three habitable stories or taller and lists what has to be fixed. SERPE-CO, a family-owned Florida Certified General Contractor working north from Pompano Beach, builds those repairs: slab edges, balconies, columns, railings, walkways and waterproofing. The inspection and the engineering stay with the design professional the association hires, and our crews follow that professional's documents.
Martin County does not run a separate recertification program, and SERPE-CO does not assume a schedule for any building. The building official for the address decides. Inside the City of Stuart that is the city's building department, the towns handle their own buildings, and in unincorporated communities such as Jensen Beach, Palm City and Hobe Sound it is the Martin County Building Department. That office sends the notice, sets the date and decides whether an earlier 25-year date applies.

Reviewed by Brett Serpe, MBA, GC, CEO of SERPE-CO · Florida Certified General Contractor CGC #1523974
Prepared by the SERPE-CO project team, with more than 20 years in concrete restoration. Last reviewed November 2026.


Local conditions
What the state milestone law asks of Martin buildings
The statute puts the first deadline at December 31 of the year that marks 30 years since the certificate of occupancy was issued, with another inspection every 10 years. A local enforcement agency may require the first inspection at 25 years based on local circumstances, including how close the building sits to salt water. Martin buildings get that answer from their own building official rather than from a countywide rule, so the notice letter is the document a board should keep close.
Notice arrives by certified mail, and the association has 14 days to pass it on to unit owners. Phase one must be done within 180 days. Phase two follows only if substantial structural deterioration turns up, and it can include destructive or nondestructive testing. Single-, two- and three-family homes of three or fewer habitable stories are excluded from the law. Martin County permit forms reference the 8th Edition (2023) Florida Building Code, which governs the repair permits that follow.
Buildings that need this work
Martin buildings working through milestone reports
Barrier island buildings take the hardest exposure. Oceanfront condominiums on the Martin County end of Hutchinson Island and along Jupiter Island face the Atlantic, and the lagoon side is never far away. Reports on these buildings typically point to spalled balcony edges, rusting railing posts set into the slab, ground-floor parking columns and beams, exterior stairs and the pool deck. Any work on the beach side of the Coastal Construction Control Line can also need an FDEP permit, so the engineer checks that early in the design.
Along the river and the mainland the pattern changes. Mid-rise and garden-style condominiums near the St. Lucie River in Stuart and Palm City, and near the Indian River Lagoon in Jensen Beach and Sewall's Point, show damage at open walkways, stair landings, seawall-side slabs and balcony soffits. In Hobe Sound, on the mainland west of Jupiter Island, some older low-rise communities may fall below the three-story threshold, and the engineer and building official confirm whether the law reaches them at all.
The work
Milestone inspection repairs in Martin County: what the job covers
- 01Review of Phase 1 and Phase 2 engineering findings
- 02Engineer's scope priced, phased and scheduled for board approval
- 03Envelope, waterproofing and structural concrete repairs
- 04Permits and building department inspections
- 05Ongoing coordination with your engineer of record
- 06Project records for association files

Our approach
How SERPE-CO runs a Martin County repair job
Before pricing anything, we sit down with the engineer's repair drawings and walk every listed location with the property manager. Each finding gets a location, a quantity and an access method, whether that is a swing stage on an oceanfront wall, a lift beside a riverfront garage or shoring under a balcony slab. The board then sees the scope as phases on a calendar, so owners know which stacks, walkways or parking rows close and for how long.
Work proceeds in the order the engineer sets. Concrete is opened, the engineer reviews the steel, repairs are placed and cured, and coatings or sealants follow. On a threshold building, taller than three stories or 50 feet, a special inspector under Florida Statute 553.79 may also be part of the process. We keep a photo and quantity log for every repair, hand it to the engineer for the final report and close the permit with the office that issued it.
SERPE-CO brings more than 20 years in the field to every job. Read about our full milestone & recertification service or browse all our work in Martin County.
Planning ahead
Planning ahead of a Martin notice
Without a countywide schedule to lean on, a Martin board should find its certificate of occupancy date and ask its building official what applies before the letter comes. Hiring the engineer early leaves room inside the 180-day phase one window, and an early walk tells the board whether phase two is likely. The structural integrity reserve study required for condominiums under Florida Statute 718.112(2)(g) covers many of the same components, so the two documents should be read side by side.
Once repairs are defined, the clock is set by statute: work on substantial structural deterioration has to begin within 365 days after the phase two report is received. That year goes to repair drawings, funding votes under the condominium documents, the permit and ordering railings and other long-lead materials. Starting outside the June 1 to November 30 hurricane season is easier, but most projects run through at least part of one, so storm shutdown steps are planned from the first day.
How we run a job
Site walk first, closed permit last.
- 01
Meet on site
Each job starts on site, walking the property and its conditions with your manager, board or engineer.
- 02
Follow the engineer's scope
The engineer writes the scope. We price it line by line, plan access and lay out each phase to build it.
- 03
Put safety first
We can never work too safely: shoring, swing stages, barricades and notices go up first.
- 04
Build the repairs
Crews work through the repairs in order, stopping for inspections wherever the engineer calls for them.
- 05
Finish and document
Final inspections, a closed permit and a full record of the work for the association.
Cities served
Milestone & Recertification throughout Martin County
- Jensen Beach
- Stuart
- Sewall's Point
- Hobe Sound
- Jupiter Island
- Palm City
Summary
What Martin boards and owners should remember
- 01
Martin County has no separate recertification program, so the state milestone law under Florida Statute 553.899 applies.
- 02
The building official for each address sets the date and decides whether a 25-year schedule applies to the building.
- 03
The City of Stuart handles buildings inside its limits, and the county covers Jensen Beach, Palm City and Hobe Sound.
- 04
Repairs for substantial structural deterioration must begin within 365 days after the phase two report is received.
Questions
Milestone & Recertification in Martin: questions we hear
Is a Jensen Beach condominium on a 25-year or 30-year schedule?
The state default is 30 years, then every 10 years. The statute lets the local building official require the first inspection at 25 years, and proximity to salt water is one of the circumstances it can weigh. Jensen Beach is unincorporated, so the Martin County Building Department sets the date. Ask that office directly, and keep its notice letter with the association's records.
Who issues milestone repair permits for a building in downtown Stuart?
Buildings inside city limits go through the City of Stuart building department. The Martin County Building Department covers unincorporated areas such as Palm City and Hobe Sound, and each town in the county handles its own permits. Confirm the office for your address before the engineer files a report, so the repair permit goes to the same place.
Can owners stay in a Palm City or Hobe Sound building during repairs?
Usually, when the engineer confirms the building is safe to occupy while work goes on. Crews set protected walkways and entrances, close balconies by stack and keep stairs and exits clear at all times. Owners get notice before work reaches their unit, and the loudest chipping is kept to hours agreed with the board ahead of time.
How early should a Sewall's Point or Stuart board talk to a contractor?
Bring a contractor in once the engineer's repair documents exist, because that is the first point when every bid covers the same work. Before that, a short walk with the engineer and a contractor helps the board understand access, phasing and the materials that take longest to arrive, so the permit application can go in soon after the report is issued.
What do Martin County milestone reports usually include?
Most reports list concrete spalls at balconies, walkways, columns and beams, railings that are corroded or loose, failed coatings on decks and walkways, and cracks in stucco that point to rusting steel below. Milestone inspection repairs in Martin County are defined by the engineer for each building, and the report sets both the list and the priority of every item on it.
Does Martin County require the first inspection at 25 years for oceanfront buildings?
SERPE-CO cannot answer that for your building. The statute allows the local building official to require the first inspection at 25 years based on local circumstances, including proximity to salt water. For Martin buildings, the city, town or county building department with jurisdiction makes that call, so ask the office that covers your address before the board plans around a date.
Laws and rules cited
- Martin County Building Department
- Florida Building Commission: Florida product approval
- Florida Statute 553.899: mandatory structural inspections for condominium and cooperative buildings
- Florida Statute 718.112: structural integrity reserve studies
Treat this page as general information only, not legal or engineering advice. Licensed engineers and architects perform the inspections, and the building official decides which dates apply to your property. SERPE-CO's role is to carry out the repairs.
Working with an engineer?
Holding drawings, specifications or a complete set of bid documents?
Structural engineers, property engineers and board members send SERPE-CO much of our restoration, pool and roofing work. Once a scope has been drawn and specified, our team prices what the documents show, raises questions where something is unclear, and lays out each line so boards can weigh the bids on equal terms.
Request an estimate
Let's plan your restoration.
Tell us where the building is and what you are seeing. We set up a visit to the property, then send a written proposal, or tell you an engineer needs to write the scope first.
- More than 20 years in the field
- St. Lucie, Martin, Palm Beach, Broward and Miami-Dade
- Family-owned Certified General Contractor
Rather call?(954) 718-3094