In short

Who handles concrete restoration in Martin?

SERPE-CO handles concrete restoration in Martin County for condominium boards, property managers and commercial building owners. Our family-owned company holds Florida Certified General Contractor license CGC #1523974. Crews map the damage, remove spalled concrete, clean or supplement corroded reinforcing and rebuild slabs, columns, beams and stairs to the licensed engineer's repair drawings, with a permit from the city, town or county building department for the address.

Free milestone planner

Is a milestone inspection coming due on your building?

Enter the year your building got its certificate of occupancy and how many stories it has. The planner estimates your deadline under Florida law, then you can send it to SERPE-CO for a second look.

Building type

Add the year and story count for an estimated due date.

About this estimate

This is a planning estimate drawn from the statewide rule in Florida Statute 553.899. Your local building department sets the real deadline and may call for the first inspection at 25 years instead. Broward County also has its own Building Safety Inspection Program. Check your date with your building official and engineer, or contact SERPE-CO and we will help you sort it out.

Concrete Restoration · Martin

Concrete restoration in Martin County is repair work on buildings that live beside salt and brackish water, from the St. Lucie River in Stuart to the oceanfront of Hutchinson Island and Jupiter Island. Moisture carrying chlorides soaks through the concrete cover until it reaches the steel, and the rusting bars expand and crack the concrete from inside. SERPE-CO, a family firm working north from Pompano Beach, cuts away the damaged material, treats or adds reinforcing, and rebuilds each slab, beam and column to the details drawn by the owner's licensed engineer.

Some Martin jobs are small, such as a handful of loose spots on a stair tower or a cracked column found while the building is prepared for paint. Others are long programs built from a milestone report, with repairs on every floor. Our crews treat both the same way. We find where sound concrete starts, remove everything that is not, clear rust from every bar, rebuild the section with the specified mortar or formed concrete and finish with a coating that helps keep water out of the repair.

Brett Serpe, MBA, GC, CEO of SERPE-CO

Reviewed by Brett Serpe, MBA, GC, CEO of SERPE-CO · Florida Certified General Contractor CGC #1523974

Prepared by the SERPE-CO project team, with more than 20 years in concrete restoration. Last reviewed November 2026.

Concrete restoration in Martin County by SERPE-CO
Martin County coastal condominium buildings

Local conditions

What wears down concrete in Martin County

Martin County is built around water. The North and South Forks of the St. Lucie River meet at Stuart and flow east past Sewall's Point to the Indian River Lagoon and the St. Lucie Inlet. Condominiums and waterfront communities on that river and lagoon sit in humid, brackish air, while oceanfront buildings on the Martin County end of Hutchinson Island and on Jupiter Island take spray straight off the Atlantic. Riverfront buildings in downtown Stuart and Palm City often show damage at seawall-side slabs, ground-floor columns and exterior stairs before anywhere else.

No county recertification program sits on top of the state law here. Florida Statute 553.899 calls for a first milestone inspection of condominium and cooperative buildings three habitable stories or taller by December 31 of the year the building reaches 30 years, then every 10 years, and lets the local building official require it at 25 years based on local conditions such as nearness to salt water. The City of Stuart, the towns and the county building department each set dates for the buildings they oversee, and the engineer's report usually lists the concrete repairs.

Buildings that need this work

Where Martin County concrete repair is found

The water decides where damage shows up first. Oceanfront condominiums on the Martin County end of Hutchinson Island take direct Atlantic spray, and their parking levels, stair towers and ocean-side balconies crack and spall early. Along the Indian River Lagoon in Jensen Beach and around the St. Lucie River in Stuart, Sewall's Point and Palm City, mid-rise condominiums, marinas and riverfront offices sit in damp brackish air, so columns near seawalls, ground-floor slabs and pool deck edges are common repair items. South of the St. Lucie Inlet, Hobe Sound and Jupiter Island add buildings close to the Intracoastal and the beach.

Away from the shoreline the work changes. Inland Stuart and Palm City have offices, medical buildings, retail centers and industrial buildings along US 1, Kanner Highway and the routes toward I-95 and Florida's Turnpike, plus low-rise condominium communities with open walkways and exterior stairs. Here rain, not ocean salt, does most of the harm. Water ponds on walkways and landings, soaks into the concrete and slowly reaches the steel, so slab edges, stair stringers and column bases are where repairs usually start on these properties.

Have a question about your building?Call the office or send a quick request. A real person answers.

The work

Concrete restoration in Martin County: what the job covers

  1. 01Repair of spalled or delaminated slabs, beams, columns and walls
  2. 02Rebar cleaned, coated, spliced or replaced
  3. 03Epoxy injection for structural crack repair
  4. 04Overhead, hand-placed and form-and-pour repair mortars
  5. 05Temporary shoring while repairs are underway
  6. 06Protective coatings, sealers and corrosion-inhibiting treatments
Concrete Restoration work underway in Martin County

Our approach

How we organize concrete repair on a Martin building

Mapping comes first. Crews tap and chain-drag each surface, mark every hollow zone and record its size so the engineer can verify the quantity before work starts. Damaged concrete is removed with small chipping hammers that leave sound concrete in place, and every rusted bar is cleared on all sides, because rust left behind a repair restarts the damage. Bars thinner than the section the engineer allows get new steel spliced alongside. Temporary shores carry the load before a column, beam or slab is opened, and the engineer checks the steel before we place repair material.

Owners and residents in Martin County nearly always stay in the building, so we split the work by floor, stack or elevation and post the schedule ahead of time. Overhead protection covers entrances and pool areas, walkways under active work are closed or rerouted, and dust and slurry are contained before they reach cars or landscaping. Keeping people safe drives every decision on site, because a SERPE-CO crew can never work too safely. Photos and measurements for every repair give the board a clean record for the association files and the final permit inspection.

SERPE-CO brings more than 20 years in the field to every job. Read about our full concrete restoration service or browse all our work in Martin County.

Planning ahead

How a Martin County board plans concrete repairs

A program usually starts when the building official sends the milestone notice by certified mail and the association tells unit owners within 14 days. Phase one must be done within 180 days of the notice, and phase two follows only if the engineer or architect finds substantial structural deterioration. Once the phase two report is in hand, the state gives the association 365 days to start repairs for that deterioration. The engineer's signed and sealed drawings go to the city, town or county office with the permit application, and Martin County permit forms reference the 8th Edition (2023) Florida Building Code.

Boards should treat report quantities as starting numbers. Damage hidden behind paint, stucco and tile appears once crews sound and chip, so a contingency belongs in the plan from day one. Season matters too. Hurricane season runs June 1 to November 30, and afternoon storms through the summer interrupt pours and curing, so swing stages and loose material get secured each time a storm approaches. Seasonal residents who leave for the summer need dates early, and a posted calendar helps the whole building plan around the work.

How we run a job

Site walk first, closed permit last.

  1. 01

    Meet on site

    Each job starts on site, walking the property and its conditions with your manager, board or engineer.

  2. 02

    Follow the engineer's scope

    The engineer writes the scope. We price it line by line, plan access and lay out each phase to build it.

  3. 03

    Put safety first

    We can never work too safely: shoring, swing stages, barricades and notices go up first.

  4. 04

    Build the repairs

    Crews work through the repairs in order, stopping for inspections wherever the engineer calls for them.

  5. 05

    Finish and document

    Final inspections, a closed permit and a full record of the work for the association.

Ready for a site visit?Tell us where the building is and what you are seeing. We will set up a time to walk it.

Cities served

Concrete Restoration throughout Martin County

Summary

What Martin boards and owners should remember

  • 01

    Oceanfront and riverfront buildings in Martin County show concrete damage first at parking levels, stair towers and seawall-side slabs.

  • 02

    The state milestone law applies in Martin, and the city, town or county building official sets each building's inspection date.

  • 03

    A Martin association has 365 days from receiving the phase two report to start repairs for substantial structural deterioration.

  • 04

    Inland Stuart and Palm City properties see slower, rain-driven damage at walkway edges, stairs and column bases.

Questions

Concrete Restoration in Martin: questions we hear

What signs of concrete damage should a Stuart condominium board watch for?

Rust streaks on the stucco or paint, cracks that run straight along a slab edge or column, small pieces of concrete on walkways and patches that sound dull when tapped are the common signs. Riverfront and ocean-facing sides usually show them first. How deep the damage goes is for a licensed engineer to judge, and that engineer details the repair. Send us any report you already have, and we can meet you on site to look at the areas it lists.

Does concrete repair in Jensen Beach or Palm City need a permit?

Yes. Jensen Beach and Palm City are unincorporated communities, so structural repairs there go through the Martin County Building Department, while buildings inside the City of Stuart and the towns use their own building officials. The permit is based on the engineer's signed and sealed drawings. We file the application, book the inspections and coordinate the engineer's site visits through each stage of the work.

How does SERPE-CO keep a concrete repair from failing again on a Hutchinson Island tower?

Most repeat failures come from steel that was only partly cleaned, a repair that never bonded to the old concrete, or chloride-laden concrete left next to the new patch. We expose each bar fully, clean it, protect it as the engineer specifies and bond the new material to sound concrete. A protective coating chosen by the engineer then goes over the finished area to slow the next round of salt.

Do residents of a Jensen Beach condominium have to move out during concrete repairs?

Rarely. The engineer decides whether occupancy can continue, and temporary shoring carries the structure wherever concrete is opened. We split the work by floor, stack or elevation, keep protected routes to entrances and give each household its dates in advance. Owners lose the use of the repair area for a while, such as a balcony or parking space, but keep their homes.

What happens when crews find more damage than the report shows?

Sounding at the start of each phase marks the true extent. The engineer measures the new areas and approves them before removal goes further. For concrete restoration in Martin County each added location gets its own photos and measurements, so the board has a written record of each change and the approval behind it.

Is a 25-year milestone inspection required for buildings near the water in Martin County?

The state law lets the local building official require the first inspection at 25 years instead of 30, based on local conditions such as nearness to salt water. Whether that applies to a given building is up to the city, town or county office with jurisdiction over it. Ask that office, or have your engineer confirm the date, before planning repairs.

Laws and rules cited

Treat this page as general information only, not legal or engineering advice. Licensed engineers and architects perform the inspections, and the building official decides which dates apply to your property. SERPE-CO's role is to carry out the repairs.

Working with an engineer?

Holding drawings, specifications or a complete set of bid documents?

Structural engineers, property engineers and board members send SERPE-CO much of our restoration, pool and roofing work. Once a scope has been drawn and specified, our team prices what the documents show, raises questions where something is unclear, and lays out each line so boards can weigh the bids on equal terms.

Request an estimate

Let's plan your restoration.

Tell us where the building is and what you are seeing. We set up a visit to the property, then send a written proposal, or tell you an engineer needs to write the scope first.

  • More than 20 years in the field
  • St. Lucie, Martin, Palm Beach, Broward and Miami-Dade
  • Family-owned Certified General Contractor

Rather call?(954) 718-3094

Work needed (choose all that apply)
Call Request an estimate