(954) 718-3094 Request an estimate

Painting & stucco

Hiring a Commercial Painting Contractor for a Condo: 7 Questions to Ask

Scaffold across a condominium during work by a commercial painting contractor

Hiring a commercial painting contractor for a condominium is a bigger decision than picking a color. On a coastal tower, the paint is part of the waterproofing, the walls usually need repairs first and the crew works at height over residents, cars and landscaping. The right contractor protects the building for the next repaint cycle. The wrong one leaves peeling paint, open cracks and leaks within a few seasons.

SERPE-CO is a family-owned Certified General Contractor, CGC #1523974, in Pompano Beach. Our first company did paint restoration in 1999, and we now repair, waterproof and paint low, mid and high-rise buildings. Here are the questions we suggest boards ask any bidder, including us.

1. Is the contractor licensed for the whole scope?

Painting projects on condominiums often include stucco repair, concrete repair, sealants and sometimes railings or windows. Some of that work needs a contractor license. Check every bidder's license and its status on the state's DBPR license verification site, and confirm insurance certificates name the association as required. A commercial painting contractor who cannot legally build the repairs will either skip them or bring in someone else.

2. Who wrote the specification?

The best bids are prices for the same specification, written by the board's engineer or architect. It should cover repairs, surface preparation, products, colors, film thickness, sealants and protection. When each painter proposes a different system, the board cannot compare bids. At SERPE-CO, the engineer always writes the scope, and we price it line by line.

Scaffolding going up a condominium before repairs and painting
Access goes up first so repairs and painting can share it.

3. How will repairs be handled before painting?

Ask how the contractor will handle cracked stucco, spalled concrete and failed sealants, and how quantities beyond the estimate are measured and approved. Painting over damage traps water and fails early. Our posts on stucco repair and window caulking explain the repairs that should come first.

4. What access will they use, and how is safety managed?

Swing stages, scaffolding and lifts each suit different buildings. Ask for the access plan, the rigging approach, how the roof is protected and how drop zones are barricaded. Suspended work is regulated by OSHA, and the agency's scaffolding guidance summarizes the requirements. Our swing stage post compares the options.

5. Which coating system and why?

Ask which primer and finish products are proposed, whether they match the specification and what film thickness will be applied. On many Florida condos, the specified system is an elastomeric paint over primer. Ask how the contractor checks thickness during the work and what records you will receive at the end.

Swing stage ready to go up for exterior painting on a condo tower
A swing stage ready to go up for the next drop.

6. How will residents be kept informed?

Painting a tower affects every owner. Ask for a sample notice, the schedule format and who the board's single point of contact will be. Good contractors post schedules by elevation, warn owners before work outside their windows and protect cars, balconies and landscaping. Color decisions go smoother with visual aids too. We prepare color overlays using Benjamin Moore and Sherwin-Williams palettes so owners see the scheme before the first coat.

7. What does close-out look like?

  • Final walk with the board and design professional.
  • Punch list completed and signed off.
  • Manufacturer warranty documents, if the specification requires them.
  • Records of products, colors, quantities and repair locations.
  • Closed permits for any permitted repair work.

Keep these records for the reserve study. On the coast, plan to repaint roughly every 7 to 10 years, and our SIRS post explains how painting is funded.

Red flags in painting bids

  • A price with no repair allowances or unit prices.
  • A different coating system than the specification, without explanation.
  • No access or safety plan.
  • Vague surface preparation, such as "clean as needed".
  • No license or insurance certificates on request.

Why repairs and painting belong in one contract

When painting and repairs are split between two companies, the board manages the gap between them. Who fixes a crack found during prep? Who pays when the painter waits for the repair crew? A single contractor licensed for both, working on one access setup, removes that friction and keeps one schedule. The engineer's specification still controls what gets repaired and how.

Cracks in concrete and stucco need the right treatment before coating. Our concrete crack repair post explains which methods suit which cracks, and our efflorescence post covers the white stains that should never be painted over.

How SERPE-CO can help

SERPE-CO is a Certified General Contractor that builds the repairs and painting on the same access, across Broward, Palm Beach and Miami-Dade. See our stucco and painting service, Palm Beach County stucco repair and painting and our bid package page, then contact us or call (954) 718-3094.

Sources
Have a question about your building?Call the office or send a quick request. A real person answers.

Questions

Questions boards ask us.

What should a condo look for in a commercial painting contractor?

Look for proper licensing for the full scope, insurance, experience with repairs and coatings at height, a clear access and safety plan, and a bid that prices the engineer's or architect's specification. Ask how repairs are measured and approved and what records you receive at close-out.

Should a painting contractor also do the stucco and concrete repairs?

Repairs must be done before painting, and doing them on the same access saves time and rigging. Some repairs require a licensed contractor. Boards should confirm the bidder is licensed for the repair work in the specification or knows who will perform it.

Why do painting bids vary so much?

Bids vary when contractors price different repairs, products, film thickness, access or preparation. A specification written by the board's engineer or architect, with repair quantities and unit prices, puts every bidder on the same basis so the board can compare line by line.

How often should a condo be painted?

On the South Florida coast, plan to repaint roughly every 7 to 10 years, depending on exposure, the coating system and maintenance. Exterior painting and waterproofing are reserve study components, so the next cycle should be funded on a schedule.

Request an estimate

Let's plan your restoration.

Tell us where the building is and what you are seeing. We set up a visit to the property, then send a written proposal, or tell you an engineer needs to write the scope first.

  • More than 20 years in the field
  • St. Lucie, Martin, Palm Beach, Broward and Miami-Dade
  • Family-owned Certified General Contractor

Rather call?(954) 718-3094

Work needed (choose all that apply)
Call Request an estimate