Milestone Inspection Repairs in Palm Beach County

We take the engineer's report through to permit closeout, on a timeline the board can plan for.

In short

Who handles milestone inspection repairs in Palm Beach?

Once a licensed engineer or architect finishes the inspection, SERPE-CO carries out milestone inspection repairs in Palm Beach County as the restoration contractor. Our crews fix the structural deterioration the report lists, under a building permit, while the engineer inspects the repairs and documents their completion for the building official.

Free milestone planner

Is a milestone inspection coming due on your building?

Enter the year your building got its certificate of occupancy and how many stories it has. The planner estimates your deadline under Florida law, then you can send it to SERPE-CO for a second look.

Building type

Add the year and story count for an estimated due date.

About this estimate

This is a planning estimate drawn from the statewide rule in Florida Statute 553.899. Your local building department sets the real deadline and may call for the first inspection at 25 years instead. Broward County also has its own Building Safety Inspection Program. Check your date with your building official and engineer, or contact SERPE-CO and we will help you sort it out.

Milestone & Recertification · Palm Beach

Once a licensed engineer or architect inspects a condominium or cooperative building under Florida Statute 553.899, the association must complete what the report calls for. That work is milestone inspection repairs in Palm Beach County, and SERPE-CO builds it; the inspection is not ours to perform. From the phase one or phase two report and the engineer's scope, we price the work and build the schedule, pull the permit and carry out structural, waterproofing and envelope repairs as the engineer directs.

Buildings with three or more habitable stories fall under the statute. In phase one, the engineer or architect examines the building visually. Signs of substantial structural deterioration trigger phase two, which can involve destructive or nondestructive testing to pin down how far the damage goes and what repairs are needed. Our project is built from that phase two report, or from the repairs a phase one report recommends when no second phase is required.

Brett Serpe, MBA, GC, CEO of SERPE-CO

Reviewed by Brett Serpe, MBA, GC, CEO of SERPE-CO · Florida Certified General Contractor CGC #1523974

Prepared by the SERPE-CO project team, with more than 20 years in concrete restoration. Last reviewed November 2026.

Milestone inspection repairs in Palm Beach County by SERPE-CO
Palm Beach County coastal condominium buildings

Local conditions

Who administers milestone inspections in Palm Beach County

Under state law, the first inspection is due by the end of the calendar year in which a building turns 30, counted from its certificate of occupancy, with another every 10 years. The law also allows the local enforcement agency to move the first inspection up to 25 years when conditions such as nearness to salt water call for it. Outside city limits, Palm Beach County's Building Division sets 25 years for buildings no more than three miles from the coastline and 30 years for everything farther inland.

Most coastal condominiums sit inside a city or town, though, and each municipal building department oversees the requirement for the buildings in its limits. In 2021 Boca Raton put its own Building Recertification Inspection Program in place, with structural and electrical reports required. Other towns apply the state statute or an ordinance of their own. Since the rules vary, the notice your building official sends is what sets your deadline.

Buildings that need this work

Buildings coming up on milestone dates and what their reports list

The buildings getting notices now sort into a few groups. Oceanfront towers on the A1A stretch through Highland Beach and Boca Raton, along with those on Singer Island, have mostly had restoration before, and their reports usually repeat balcony edge damage, garage-level deterioration and roof and parapet issues. Mid-rise buildings in Jupiter, Juno Beach, South Palm Beach and Delray Beach tend to list problems at walkway slabs, open stair towers, railing connections and ground-floor parking columns. The statute treats cooperative buildings the same way as condominiums.

Another big group is the three- and four-story buildings in the large inland communities of Greenacres, West Palm Beach, Boynton Beach and the area west of Delray Beach. Many never had a structural report until now, and every building in a multi-building community gets evaluated. Reports commonly list cracked stair and walkway concrete, rusted railing posts, broken slab edges at screened porches and spalled breezeway columns. With several buildings sharing one association and one budget, the work is usually run as a program that takes the most urgent findings first.

Have a question about your building?Call the office or send a quick request. A real person answers.

The work

Milestone inspection repairs in Palm Beach County: what the job covers

  1. 01Review of Phase 1 and Phase 2 engineering findings
  2. 02Engineer's scope priced, phased and scheduled for board approval
  3. 03Envelope, waterproofing and structural concrete repairs
  4. 04Permits and building department inspections
  5. 05Ongoing coordination with your engineer of record
  6. 06Project records for association files
Milestone & Recertification work underway in Palm Beach County

Our approach

Moving from the inspection report to completed repairs

First we go through the report with the engineer, walk the property and work out how crews will reach every repair area. The board then gets a price that follows the engineer's scope item by item, a phasing plan and an organized schedule built around the season and town work-hour limits. The statute requires repairs for substantial structural deterioration to get underway no more than 365 days after phase two is reported, though a local ordinance can move that date earlier.

As work moves forward the engineer inspects it, and once repairs are finished, the engineer prepares the follow-up paperwork the building department asks for. Our repair logs, photos and quantities back it up. Boards rely on the same record when they update the structural integrity reserve study, because it shows what was restored and when.

SERPE-CO brings more than 20 years in the field to every job. Read about our full milestone & recertification service or browse all our work in Palm Beach County.

Planning ahead

Moving from the building official's notice to permitted repairs

The statute sets the steps. Owners have 180 days after receiving written notice to complete phase one. The engineer or architect then seals the report and sends it to both the association and the building official who has jurisdiction, and within 45 days of getting it, the association has to distribute the inspector's summary to unit owners. Boards can use that window to have the engineer prepare repair documents, because a contractor needs the engineer's details and quantities, not just findings, to price the work.

Money and timing get decided at the same table. The board, the manager, the attorney and the reserve study provider work out how the repairs will be paid for, while the Condominium Act and the association's governing documents decide which approvals are needed. Engineers and contractors fill up before shared deadlines, so boards that start early have more say over when work happens. Hurricane season, summer rain and winter occupancy all affect the phasing, and SERPE-CO confirms the current local and association limits on noisy work before dates are locked.

How we run a job

Site walk first, closed permit last.

  1. 01

    Meet on site

    Each job starts on site, walking the property and its conditions with your manager, board or engineer.

  2. 02

    Follow the engineer's scope

    The engineer writes the scope. We price it line by line, plan access and lay out each phase to build it.

  3. 03

    Put safety first

    We can never work too safely: shoring, swing stages, barricades and notices go up first.

  4. 04

    Build the repairs

    Crews work through the repairs in order, stopping for inspections wherever the engineer calls for them.

  5. 05

    Finish and document

    Final inspections, a closed permit and a full record of the work for the association.

Ready for a site visit?Tell us where the building is and what you are seeing. We will set up a time to walk it.

Cities served

Milestone & Recertification throughout Palm Beach County

Summary

What Palm Beach boards and owners should remember

  • 01

    Under Florida Statute 553.899, phase one of a Palm Beach County milestone inspection must be finished within 180 days after owners receive written notice.

  • 02

    Within 45 days of receiving a milestone report, a Palm Beach County association must give its unit owners the summary the inspector prepared.

  • 03

    Inland multi-building communities in Greenacres, Boynton Beach and West Palm Beach usually run milestone repairs one building at a time.

  • 04

    A milestone report on a Palm Beach County building lists findings, but getting a permit takes separate repair documents with details and quantities.

Questions

Milestone & Recertification in Palm Beach: questions we hear

In Palm Beach County, is the first milestone inspection at 25 years or at 30?

In unincorporated Palm Beach County, the county's Building Division sets 25 years for condo and co-op buildings no more than three miles from the coastline and 30 years for inland buildings, repeating every 10 years. Inside a municipality, the city or town runs its own process under the law, and your building official sets your date.

Is Boca Raton's recertification program the same as the state milestone inspection?

Boca Raton set up a Building Recertification Inspection Program of its own in 2021. It covers buildings over 50 feet or more than three stories tall, among others, and requires structural and electrical reports. By contrast, the state milestone law reaches condominium and cooperative buildings with three or more habitable stories statewide. The city tells each owner what to file and when.

How does a structural integrity reserve study relate to the repairs we make in Palm Beach County?

Florida Statute 718.112 requires a structural integrity reserve study at least once every 10 years for condominium associations whose buildings have three or more habitable stories. The study looks at components such as the roof, the structure, waterproofing, exterior painting, and exterior doors and windows. Finished repairs reset the remaining useful life the study gives those components.

If phase one at a Boynton Beach or Jupiter condominium shows no substantial structural deterioration, what comes next?

With no signs of substantial structural deterioration in phase one, there is no phase two, and the engineer or architect files the sealed report with the building official and the association. That report can still recommend repairs or maintenance, and many boards go ahead with the work.

Can repairs begin at a Delray Beach or Boca Raton building before phase two is done?

Often they can, if the engineer agrees. Urgent spots can get shoring or a permitted repair while testing continues in other parts of the building. Most milestone inspection repairs in Palm Beach County, though, take their full scope from the repair documents and the phase two report.

In West Palm Beach or Highland Beach, who gives the building official proof that the milestone repairs are finished?

The engineer or architect prepares that documentation, and after the building department completes its own final inspection, it closes the permit. SERPE-CO, as the contractor, backs it up with repair logs by location, photos of steel before and after repair, measured quantities and records of materials used. The building official decides what must be filed and by when.

Laws and rules cited

Treat this page as general information only, not legal or engineering advice. Licensed engineers and architects perform the inspections, and the building official decides which dates apply to your property. SERPE-CO's role is to carry out the repairs.

Working with an engineer?

Holding drawings, specifications or a complete set of bid documents?

Structural engineers, property engineers and board members send SERPE-CO much of our restoration, pool and roofing work. Once a scope has been drawn and specified, our team prices what the documents show, raises questions where something is unclear, and lays out each line so boards can weigh the bids on equal terms.

Request an estimate

Let's plan your restoration.

Tell us where the building is and what you are seeing. We set up a visit to the property, then send a written proposal, or tell you an engineer needs to write the scope first.

  • More than 20 years in the field
  • St. Lucie, Martin, Palm Beach, Broward and Miami-Dade
  • Family-owned Certified General Contractor

Rather call?(954) 718-3094

Work needed (choose all that apply)
Call Request an estimate