(954) 718-3094 Request an estimate

St. Lucie County, Florida

Milestone Inspection Repairs in St. Lucie County

We take the engineer's report through to permit closeout, on a timeline the board can plan for.

In short

Who handles milestone inspection repairs in St. Lucie?

Condominium and cooperative associations hire SERPE-CO for milestone inspection repairs in St. Lucie County once a licensed engineer or architect has issued the milestone report. Our part is pricing and permitting the engineer's scope, then carrying out each concrete, balcony, railing and waterproofing item it lists, so the engineer can file an amended report and the building official can close the matter.

Free milestone planner

Is a milestone inspection coming due on your building?

Enter the year your building got its certificate of occupancy and how many stories it has. The planner estimates your deadline under Florida law, then you can send it to SERPE-CO for a second look.

Building type

Add the year and story count for an estimated due date.

About this estimate

This is a planning estimate drawn from the statewide rule in Florida Statute 553.899. Your local building department sets the real deadline and may call for the first inspection at 25 years instead. Broward County also has its own Building Safety Inspection Program. Check your date with your building official and engineer, or contact SERPE-CO and we will help you sort it out.

Milestone & Recertification · St. Lucie

Milestone inspection repairs in St. Lucie County are the concrete, balcony, railing and waterproofing items a licensed Florida engineer or architect lists after the milestone inspection of a condo or co-op building under Florida Statute 553.899. SERPE-CO is a Certified General Contractor, not an inspector. A board brings us the report, and we price the engineer's scope, build a phasing plan and a schedule, obtain the permit from the right building department and build each repair until the engineer is satisfied with the work.

St. Lucie has no recertification ordinance of its own. Three building departments apply the state law: St. Lucie County Building and Code Regulation for unincorporated areas, the City of Port St. Lucie and the City of Fort Pierce. Each office sends its own notices by certified mail and closes out the work in its own way, so the first thing we confirm on any job is which office has the address. SERPE-CO travels up the coast from Pompano Beach for this work.

Brett Serpe, MBA, GC, CEO of SERPE-CO

Reviewed by Brett Serpe, MBA, GC, CEO of SERPE-CO · Florida Certified General Contractor CGC #1523974

Prepared by the SERPE-CO project team, with more than 20 years in concrete restoration. Last reviewed November 2026.

Milestone inspection repairs in St. Lucie County by SERPE-CO
St. Lucie County coastal condominium buildings

Local conditions

How the milestone law is applied across St. Lucie

The county page for unincorporated St. Lucie lists the first inspection at 30 years with a new one each decade, or at 25 years on the same 10-year cycle when a building stands within 3 miles of the coastline. Reports are filed on the statewide Milestone Inspection Report Form, EB 18-2024. Port St. Lucie applies the same 25-year coastal rule to buildings inside the city. Fort Pierce lists the 30-year state schedule and accepts reports on paper or by email.

Under the statute, phase one is due within 180 days of the notice, and phase two follows only when the engineer finds substantial structural deterioration. Repairs for that deterioration must begin within 365 days of the phase two report. In Port St. Lucie the association hires a state licensed contractor to obtain the Milestone Phase 2 permit, and the Building Official can approve a 60-day extension. In Fort Pierce a garage or parking area under living space counts as a story when the building is measured.

Buildings that need this work

St. Lucie buildings reaching milestone age

Oceanfront condominiums along A1A on Hutchinson Island take salt spray from the Atlantic and damp air off the Indian River Lagoon behind them. Reports on those buildings tend to list balcony slab edges and railing posts, columns and beams at ground-level parking, stair towers, roof slabs under mechanical equipment and the pool deck. Lagoon-front buildings in Fort Pierce and St. Lucie Village, close to the Fort Pierce Inlet and the historic downtown waterfront, show the same kinds of damage at slab edges, walkways and balcony soffits.

Port St. Lucie is mostly residential and sits inland along the North Fork of the St. Lucie River, so its milestone work looks different. Mid-rise condominiums near the river and along US 1, St. Lucie West and Tradition commonly need catwalk and stair repairs, railing corrections, stucco cracks traced back to rusting steel and new sealant at expansion joints. Inland buildings still need their first inspection at the age the building official sets, even when they stand well away from the beach.

Have a question about your building?Call the office or send a quick request. A real person answers.

The work

Milestone inspection repairs in St. Lucie County: what the job covers

  1. 01Review of Phase 1 and Phase 2 engineering findings
  2. 02Engineer's scope priced, phased and scheduled for board approval
  3. 03Envelope, waterproofing and structural concrete repairs
  4. 04Permits and building department inspections
  5. 05Ongoing coordination with your engineer of record
  6. 06Project records for association files
Milestone & Recertification work underway in St. Lucie County

Our approach

From the engineer's report to a completion letter

We start with the report and a walk of the building beside the engineer, marking every location and how a crew will reach it: swing stage, lift, shoring or scaffold. The board receives a written price for the engineer's scope, broken into phases by elevation, stack or area, with the access plan and a calendar for each one. Railings and other long-lead items are ordered as soon as the repair drawings allow, so they arrive when the slab edges are ready for them.

While repairs are open, the engineer reviews exposed reinforcing steel and each stage before it is closed. Residents keep safe entrances and clear exits, and balconies are closed in sequence rather than all at once. At the end we give the engineer the photos and quantities needed for the amended report. In Port St. Lucie that report states the building is safe for continued use, and the city then issues a completion letter with the next 10-year date.

SERPE-CO brings more than 20 years in the field to every job. Read about our full milestone & recertification service or browse all our work in St. Lucie County.

Planning ahead

Getting a St. Lucie board ready for the report

The certified letter from the building official starts the clock, and the association then has 14 days to tell unit owners. Boards that already know their building's age and have an engineer in mind lose no time on phase one, which is due within 180 days of the notice. Florida Statute 718.112(2)(g) also calls for a structural integrity reserve study on condominiums three or more habitable stories tall, and reading that study next to the milestone report helps a board plan funding.

After phase two, the engineer issues sealed repair drawings, the board arranges funding through the votes its documents require, and we prepare the permit application. If the engineer finds substantial structural deterioration, the repairs must begin within 365 days of receiving the phase two report. Fort Pierce buildings in a Special Flood Hazard Area need an early look at the FEMA 50 percent rule, since repairs above half of market value bring full flood compliance. Hurricane season, June 1 to November 30, shapes which elevations we open first.

How we run a job

Site walk first, closed permit last.

  1. 01

    Meet on site

    Each job starts on site, walking the property and its conditions with your manager, board or engineer.

  2. 02

    Follow the engineer's scope

    The engineer writes the scope. We price it line by line, plan access and lay out each phase to build it.

  3. 03

    Put safety first

    We can never work too safely: shoring, swing stages, barricades and notices go up first.

  4. 04

    Build the repairs

    Crews work through the repairs in order, stopping for inspections wherever the engineer calls for them.

  5. 05

    Finish and document

    Final inspections, a closed permit and a full record of the work for the association.

Ready for a site visit?Tell us where the building is and what you are seeing. We will set up a time to walk it.

Cities served

Milestone & Recertification throughout St. Lucie County

Summary

What St. Lucie boards and owners should remember

  • 01

    Unincorporated St. Lucie County and Port St. Lucie list a first inspection at 25 years for buildings within 3 miles of the coastline, while other buildings start at 30.

  • 02

    Fort Pierce lists the 30-year state schedule and counts a garage or parking area under living space as a story.

  • 03

    Phase one is due within 180 days of the building official's notice, which arrives by certified mail.

  • 04

    In Port St. Lucie a state licensed contractor obtains the Milestone Phase 2 permit, and the city issues a completion letter after repairs.

Questions

Milestone & Recertification in St. Lucie: questions we hear

Is a Hutchinson Island condominium on the 25-year schedule?

That depends on which office has the address. Part of the island in St. Lucie is handled by St. Lucie County and part by the City of Fort Pierce. The county lists 25 years for buildings within 3 miles of the coastline, while the Fort Pierce page lists the 30-year state schedule. Confirm the office first, then ask its building official to confirm the date for your building in writing.

Does a Port St. Lucie association need a contractor to pull the phase two permit?

Yes. The City of Port St. Lucie states that the association must hire a State licensed contractor to obtain a Milestone Phase 2 permit. SERPE-CO holds a Florida Certified General Contractor license and can apply for that permit once the engineer's repair documents are ready. Under the state law, repairs for substantial structural deterioration must start within a year, 365 days, of the association receiving the phase two report.

Does SERPE-CO do the inspection for our Fort Pierce building?

No. A licensed Florida architect or engineer carries out the milestone inspection and writes the report, including any destructive or nondestructive testing in phase two. SERPE-CO builds the repairs that report calls for. If your board has not chosen a design professional yet, we can meet with the one you pick and help plan access and phasing as the report takes shape.

Why do Hutchinson Island milestone reports so often list railings?

Railing posts are set into the slab edge, where salty air and rain reach the reinforcing steel first. As a post corrodes, it splits the concrete around it and works loose. Engineers frequently call for posts to be cut out, the slab edge repaired and new railings anchored, so railings become a long-lead item that a board should order soon after the repair drawings are done.

What items show up most in St. Lucie milestone reports?

Common findings include spalled concrete at balcony edges, walkways, columns and beams, loose or corroded railings, worn deck coatings, cracked stucco over rusting steel and failed joint sealants. Milestone inspection repairs in St. Lucie County are still set building by building, and only your engineer's report decides the list, the quantities and the order in which the work happens.

Can a Port St. Lucie building get more time for milestone repairs?

The City of Port St. Lucie states that its Building Official can approve a 60-day extension. A request is easier to discuss when the permit is already issued and the contractor has a written schedule. Buildings in unincorporated St. Lucie and in Fort Pierce follow their own office's process, so ask the building official that sent your notice how extensions are handled there.

Laws and rules cited

Treat this page as general information only, not legal or engineering advice. Licensed engineers and architects perform the inspections, and the building official decides which dates apply to your property. SERPE-CO's role is to carry out the repairs.

Working with an engineer?

Holding drawings, specifications or a complete set of bid documents?

Structural engineers, property engineers and board members send SERPE-CO much of our restoration, pool and roofing work. Once a scope has been drawn and specified, our team prices what the documents show, raises questions where something is unclear, and lays out each line so boards can weigh the bids on equal terms.

Request an estimate

Let's plan your restoration.

Tell us where the building is and what you are seeing. We set up a visit to the property, then send a written proposal, or tell you an engineer needs to write the scope first.

  • More than 20 years in the field
  • St. Lucie, Martin, Palm Beach, Broward and Miami-Dade
  • Family-owned Certified General Contractor

Rather call?(954) 718-3094

Work needed (choose all that apply)
Call Request an estimate