Board members still search for the Broward County 40 year recertification, because that was the program's name for decades. The rules have moved. Broward's Building Safety Inspection Program now calls for the first structural and electrical inspection at 25 years from a building's certificate of occupancy. Knowing the current schedule, and how it overlaps the state milestone law, saves boards from planning around an outdated date.

SERPE-CO is a family-owned Certified General Contractor headquartered in Pompano Beach, in the middle of Broward County. We build the concrete and structural repairs that follow these inspections. Licensed engineers and architects perform the inspections and write the scope. Treat this article as background, not legal or engineering advice.

Where the Broward County 40 year recertification stands today

Broward's program is set by Board of Rules and Appeals Policy 05-05, most recently amended August 9, 2024, and enforced by the local building official. A building or structure receives a structural and electrical inspection by a licensed engineer or architect at 25 years from its certificate of occupancy, and again every 10 years from the year the first one was required. The county explains the program on its Building Safety Inspection Program page.

So the Broward County 40 year recertification is really a 25-year inspection with 10-year repeats. The old name survives in conversation, in real estate listings and in search boxes, which is why we use it here.

The 180-day clocks in Policy 05-05

Policy 05-05 sets two deadlines boards should mark on the calendar:

  1. Hiring and forms. The owner or association has 180 days after the notice to hire the engineer or architect and return the required forms.
  2. Repairs. When repairs are needed, the owner has 180 days from the report to complete them unless the building official sets another timeframe. Longer schedules can be approved with an active permit.

Concrete restoration on an occupied tower rarely fits in a few months once design, bidding and permitting are counted. Boards that start early, and keep an active permit, have room to phase the work sensibly. Read the current policy text, linked in the sources below, with your engineer.

Demolition of a deteriorated balcony before a new slab is formed
Some balconies need full removal and a new slab, as the engineer specifies.

How the county program overlaps the state milestone law

Florida's milestone law, Statute 553.899, applies to condominium and cooperative buildings three habitable stories or more. The state's first inspection is due at 30 years, every 10 years after, and the local enforcement agency may require it at 25. Broward's program reaches more building types than the state law and already starts at 25 years.

A Broward condominium can therefore fall under both programs at once, with different paperwork. Many engineers coordinate the two so one site visit serves both. Our Florida milestone inspection post covers the state steps, and our milestone inspection guide compares Broward, Miami-Dade and Palm Beach.

What the inspection usually finds on Broward buildings

Most of the buildings we work on in Broward sit within reach of salt air. The common findings are familiar: spalling at balcony slab edges, corroded railing posts, cracked columns, garage ceiling delamination, failed sealants and worn coatings. Our posts on balcony repair and concrete delamination explain what those conditions mean and how the repairs work.

The engineer decides which findings are structural and which are maintenance. Repairs follow the engineer's drawings and specifications, not a contractor's opinion.

From report to closed permit in Broward

  • The engineer prepares repair documents with quantities by location.
  • Licensed contractors price the same documents, and the board compares them line by line.
  • The contractor pulls the permit, sets shoring and protection, and phases the work around residents.
  • The engineer inspects at the stages the specification requires, and the building department inspects the permitted work.
  • Policy 05-05 calls for the engineer to re-inspect the repaired areas and issue an amended report with a sealed letter stating the building is acceptable for continued use.

That last step is what closes the Broward County 40 year recertification cycle. Keep the amended report and sealed letter with the permit records for the next inspection and the reserve study.

New balcony slab finished on a Broward condominium
A finished balcony slab, ready for waterproofing and the railing.

Cities inside Broward

Policy 05-05 is enforced by the local building official, so the city building department often sends the notices and reviews the reports. Fort Lauderdale, Pompano Beach, Hollywood, Hallandale Beach, Deerfield Beach and other cities each run their own counter and permit process. Your engineer will know the local routine. We work across the county, including Fort Lauderdale, Pompano Beach and Hollywood.

Questions boards ask us during Broward repairs

Boards often ask whether the whole building must close during the work. In most cases it does not. Work is phased by stack, elevation or garage section, with shoring, barricades and overhead protection around each active area. Residents may lose use of a balcony or parking space for a stretch, and the schedule tells them when.

Another common question is whether the repairs will cover everything the inspection noted. The answer depends on the engineer's documents. Structural items are usually required now, while maintenance items such as painting may be scheduled for a later phase. The engineer decides which is which, and the reserve plan funds the later work.

Boards also ask how long a typical repair takes. Every building is different, so the honest answer comes from the engineer's quantities and the contractor's phasing plan. Access is often the biggest variable: swing stages, scaffolding or shoring each change how many crews can work at once. Our swing stage post explains the access choices.

Finally, owners want to know who to call with a concern during the work. A good project sets a single point of contact for the board and a posted schedule for residents. Clear notices before each phase prevent most complaints before they start.

Planning ahead

Add the building's certificate of occupancy date and the next inspection date to the board's long-range calendar. Line up the engineer a year ahead when you can. Coordinate the inspection with the structural integrity reserve study so the reserve plan reflects real findings. Our post on the structural integrity reserve study explains that link.

How SERPE-CO can help

Once your engineer has prepared repair documents, SERPE-CO prices the engineer's scope, pulls the permit and builds the work. See our milestone inspection repairs in Broward County page, contact us or call (954) 718-3094.

Sources
Have a question about your building?Call the office or send a quick request. A real person answers.

Questions

Questions boards ask us.

Is Broward County recertification still at 40 years?

No. Under Board of Rules and Appeals Policy 05-05, Broward's Building Safety Inspection Program requires a structural and electrical inspection at 25 years from the certificate of occupancy, then every 10 years from the year the first one was required. The 40-year name is a holdover from the program's history.

How long do we have to make repairs in Broward?

Policy 05-05 gives the owner 180 days from the report to complete required repairs unless the building official sets another timeframe. Longer schedules can be approved with an active permit. Check the current policy and your building official's notice for your exact deadline.

Does the Broward program replace the state milestone inspection?

Not automatically. The state milestone law in Florida Statute 553.899 and Broward's Policy 05-05 are separate requirements that can apply to the same condominium. Many engineers coordinate the two so one site visit serves both. Ask your engineer and attorney how to handle both for your building.

Who performs the Broward inspection?

A Florida-licensed engineer or architect performs the structural and electrical inspection and prepares the report. Contractors do not perform it. SERPE-CO prices and builds the repairs the engineer specifies, under permit, after the report is issued.

Request an estimate

Let's plan your restoration.

Tell us where the building is and what you are seeing. We set up a visit to the property, then send a written proposal, or tell you an engineer needs to write the scope first.

  • More than 20 years in the field
  • St. Lucie, Martin, Palm Beach, Broward and Miami-Dade
  • Family-owned Certified General Contractor

Rather call?(954) 718-3094

Work needed (choose all that apply)
Call Request an estimate