Upload your project documents
Send SERPE-CO Your Bid Package or Drawings
Upload a full bid set, an engineer's report or just a few photographs, and SERPE-CO will explain what you get back and when.
In short
What documents does SERPE-CO need to price a restoration project?
Start with what you have. A complete bid package holds the engineer's report, sealed drawings, the project manual or specifications, the bid form and all addenda. Photographs, past repair records and a survey help too. Upload files with the form further down, or for a large set put a download link in your message, and SERPE-CO will confirm receipt and give you a date for our bid.
Sending documents
What a complete bid package should include
With a complete bid package, SERPE-CO can price exactly what your engineer designed and guess at nothing. The core is the condition report, the repair drawings bearing the engineer's seal, and the project manual or specifications, with its general conditions, product requirements and technical sections. The bid form shows which items are lump sums and which are unit prices, and each addendum records what has changed. Missing pieces do not stop us from helping, though the proposal will carry more clarifications as a result.
Supporting material counts for more than most people think. Photos of the worst areas, records of earlier repair campaigns, past engineering reports, a survey, any as-built drawings, and notes on access, parking, pool season or resident limits all shape how the job is planned and priced. A note on what matters most to the owner, for example wrapping up the ocean side before the busy season, lets us build an organized schedule that suits the property.
Reading the set
How SERPE-CO goes through your documents
Our team goes through the documents carefully before pricing anything. We confirm the bid form, specifications and drawings line up with one another, list the addenda received, and note conflicts, missing details or items that cannot be priced as written. Bid form quantities are compared with the drawings, and wherever repair locations are marked by the engineer, those sheets get reviewed too. Named products are checked for availability, since a discontinued mortar or coating is far easier to deal with during bidding than after the contract is awarded.
If the building can be visited, SERPE-CO walks it. For a formal bid that is normally the engineer's pre-bid walk, and for a smaller job we set up a visit with the manager. Our people look at how swing stages and equipment will get in, where materials can be staged, garage clearances, pool deck loads, power and water, and the areas the drawings only outline. Questions from the review are sent to the engineer in writing so that every bidder gets the answer at once, and nobody works from an outdated scope.

What we return
What comes back to you from SERPE-CO
For a formal bid, the form comes back filled in exactly as issued, every line priced and every addendum acknowledged. A short cover letter goes with it, covering clarifications, plain exclusions, how long the job will take and how it will be phased, our crews and equipment, and any voluntary alternates, which stay apart from the base bid so the comparison stays clean. If the specification requests a schedule of values, references or qualifications, they arrive in the requested format, not in a brochure of ours.
RFIs that come up in review go to the engineer before bids are due, each numbered and linked to a specific sheet or specification section. Where a quantity is left open in the documents, an allowance for hidden conditions for instance, the price follows the bid form instructions and the assumption is noted. The aim is a proposal the engineer can compare with the rest without a call to us, and a number that holds up once work begins because the scope behind it was read with care from start to finish.
Turnaround
When our bid will reach you
How long pricing takes depends on the size of the job and how complete the bid package is. A single-building balcony repair can be read quickly, while a project combining a tower, a garage and a pool, with a thick project manual and many locations priced by the unit, needs more time. Once your bid package arrives, SERPE-CO confirms receipt, says whether we will bid and gives you a date for our number. If the bid date is fixed, note it in the message, and we will tell you right away if it is too tight to price carefully.
When the honest answer is no, you hear it early. A job outside our area or our trades, or one on a schedule we could not staff, deserves a quick decline so you can line up another bidder. Once we commit, the engineer stays informed if open questions are slowing us down, instead of hearing nothing until the deadline. With more than 20 years in the field, the Serpe family would rather pass on a bid than send in a number nobody read properly and then have to stand behind it later.
Early stage
Only have a report or a few photos?
Plenty of owners and managers have no drawings yet, and that is fine. Send an engineer's milestone or condition report if you have one, and SERPE-CO will read through the findings and visit the property. If all you have are photographs of cracks, rust stains, leaks or loose concrete, send them with the address and a short note. We can then explain what such conditions tend to mean and the kind of work they point to, and for structural repairs we will recommend that a licensed engineer design the repair before bidding.
Some non-structural work, such as recoating, sealant replacement or minor flatwork, may need only a short written scope from your engineer or architect, which SERPE-CO prices after a site visit. Structural concrete, garage repairs and anything coming out of a milestone inspection are different: full sealed documents from the engineer protect the owner and give every bidder an identical scope to price. Both routes begin with the same upload, and SERPE-CO will tell you plainly which one your project needs and what happens after that.
Upload today
Use the form below to upload your documents
The upload form near the end of this page takes PDF and image files, so drawings, specifications, reports and photos can be uploaded directly. Big bid sets are often too large for a web form. For those, share a link from a cloud storage or file transfer service and paste it into the message along with the name of your engineer of record and the dates for the bid and the site walk. Add a phone number so our team can call with any questions about the set.
Tell us what you are after: a priced bid on your form, a planning talk covering scope and phasing, or a view on whether an engineer should come first. SERPE-CO works on projects from St. Lucie County to Miami-Dade, from balconies on one building up to a project that combines a garage, pool and roof. Send your bid package with the form below, and SERPE-CO will confirm it arrived and say when our response will be ready.
Checklist
Checklist for your bid package
- 01Engineer's milestone or condition report
- 02Repair drawings, signed and sealed
- 03Project manual or specifications
- 04The bid form and every addendum
- 05Photos of the problem areas
- 06Earlier repair history and reports
- 07As-built drawings or a survey
- 08Contacts, bid date and site walk date
Services involved
Repairs these documents tend to call for.
Summary
Bid package: points to remember
- 01
A complete bid package holds sealed drawings, specifications, the engineer's report, the bid form and all addenda.
- 02
Your bid returns on your own form, with exclusions, clarifications, a schedule and any RFIs we raised.
- 03
Once a bid package arrives, SERPE-CO confirms receipt and gives you a date for our bid.
- 04
A report or a handful of photos is enough to get started, and SERPE-CO will say if an engineer should come first.
- 05
Use the form below for PDF and image files, or paste a download link for big sets.
Questions
Questions about the bid package.
Which file types does the form accept?
The form takes PDF and image uploads, enough for drawings, reports, specifications and photos. If your files use another format, or the set is more than the form can carry, share a link from a cloud storage or file transfer service and put it in your message so our team can pull down the full set.
Do I need drawings before I reach out?
No. An engineer's report, one page of a reserve study or a few photos are enough to begin. SERPE-CO will look over what you send and visit the property, then let you know whether the work can be proposed as is or should first be designed by a licensed engineer, which is usually the right route for structural concrete and milestone inspection repairs.
Is our bid form priced exactly as written?
Yes. Our base bid sticks to the form as issued, one line at a time, pricing units wherever the form asks for them and acknowledging each addendum. Anything we would do differently is offered separately, as a substitution request or a voluntary alternate, listed apart from the base bid so all bidders compare on equal terms.
Will you come to pre-bid meetings and site walks?
Yes, whenever our schedule allows, and we encourage them. Walking the site shows things drawings cannot, like tight access, limited staging room, low garage clearances and the way residents move through the building. Tell us in your message when and where the walk is, so our team can plan for it, and any questions afterward go through the engineer in writing.
Could my project be too small?
Probably not. SERPE-CO takes on single-building balcony and slab edge repairs, pool deck work and sections of a garage, and large restoration jobs done in phases. If a job is outside the work we do or the area we cover, we say so quickly, and you can move on to another contractor right away.
Do you also review roofing and pool project documents?
Yes. Roof consultant specifications, garage repair documents and drawings for commercial pools all get the same careful review as a concrete restoration set. Questions go through the consultant or engineer, pricing follows the form provided, and SERPE-CO coordinates the other trades named in the documents.
Industry standards and guides
- International Concrete Repair Institute (ICRI): repair guidelines for concrete
- American Concrete Institute (ACI): codes and guides for concrete construction and repair
- Florida Building Code
- Florida Statute 553.899: mandatory structural inspections for condominium and cooperative buildings
On every project, our repair methods and materials follow the engineer's specification, the product maker's requirements and the current building code. Treat this page as general information, not engineering advice.
Request an estimate
Share your bid documents.
Tell us where the building is and what you are seeing. We set up a visit to the property, then send a written proposal, or tell you an engineer needs to write the scope first.
- More than 20 years in the field
- St. Lucie, Martin, Palm Beach, Broward and Miami-Dade
- Family-owned Certified General Contractor
Rather call?(954) 718-3094