Job photos from SERPE-CO crews, start to finish: pool decks, balconies, garages, columns and full exteriors on condominiums from St. Lucie to Miami-Dade.
12 projects
Featured restoration projects, start to finish.
These projects are condominium and commercial buildings SERPE-CO crews have restored from St. Lucie County to Miami-Dade County. Each gallery below follows one of our projects through the job photos: tear-out, rebar repair, new concrete, waterproofing and the finished building. Repairs on these projects were built to the repair drawings of the engineer of record, as every structural repair should be. Pick a project to jump to its photos, then see the matching services or read what boards ask in our FAQs. SERPE-CO holds Florida Certified General Contractor license CGC #1523974, which you can verify on the Florida DBPR license search.
Rooftop pool and pool deck restoration
Oceania IV
An elevated pool deck in Sunny Isles Beach taken down to the reinforced topping, rebuilt with new reinforcing, and finished with new pavers, turf and pool trim.
-
01
The tower and its rooftop pool deck from above
-
02
The pool drained before work commenced
-
03
Crew patching up the pool deck
-
04
Cracks marked and excavated in the pool walls
-
05
Pool wall reinforcing exposed
-
06
New rebar wading pool shell and reinforced topping slab
-
07
Forming and pouring the wading pool
-
08
Pouring concrete over the new deck reinforcing
-
09
Wet cutting pavers on-site
-
10
Setting and leveling the new pavers
-
11
Finished
New pool deck installed
-
12
Finished
Finished paver deck by the cabana
-
13
Installing turf along the planter walls
-
14
Finished
Pool edge, depth markers and ladder back in place
-
15
Finished
New waterline tile on the pool wall
Balcony slab replacement on full scaffolding
The Glens
Balcony slabs removed and replaced on a mid-rise condominium, working from a full scaffold with doors and windows protected.
-
01
Shoring and formwork set under a balcony
-
02
New reinforcing tied over the forms with chairs
-
03
Crew placing concrete into the balcony forms
-
04
Finished
New elevated balcony slab after the pour
-
05
Scaffolding rigging up onto the building
-
06
Screeding a new balcony slab
-
07
Demolition of an existing balcony
-
08
Breaking out deteriorated concrete at the slab edge
-
09
Strike-off on a new slab
-
10
Finished
New balcony slab finished, doors still protected
-
11
Crew working a pour under the scaffold
-
12
New slab curing beside the scaffold
-
13
Full scaffold on the building elevation
-
14
Finished
The building with the scaffold down and completed
Balcony slab repair and railing reset
The River North
Small balcony slabs on two-story townhomes cut out, re-reinforced and recast, then the railings reset.
-
01
Balcony slab removed, windows protected
-
02
Railing still in and the slab opened up
-
03
Shoring set below the balcony
-
04
New reinforcing placed in the form
-
05
Crew mixing structural concrete
-
06
Sika 211 arriving on-site
-
07
Working on the balcony
-
08
Rolling scaffold set for demo
-
09
Crew placing concrete from the scaffold
-
10
Passing material up to the balcony
-
11
Finishing the new slab edge
-
12
Corroded railing missing fasteners
-
13
Finished
Slab edge repaired with the railing reset and new fasteners in place
Column and balcony repair from swing stages
2770 Building
Oceanfront high-rise repairs carried out from suspended swing stages, with ground-floor columns shored and rebuilt.
-
01
Rigging the roof for the swing stages
-
02
Outriggers set on the oceanfront parapet
-
03
Swing stage staged at the ground floor
-
04
SERPE-CO stage ready to go up
-
05
Barricades and signage around the work zone
-
06
Swing stage working the elevation
-
07
Roof rigging for multiple drops
-
08
Corroded column reinforcing exposed
-
09
Shoring set and columns opened up
-
10
Column formed for new concrete
-
11
Finished
Column repaired and ready for finish
-
12
Swing stage on the upper floors
-
13
Balcony work in progress from the stage
Structural shoring, steel repair and walkway coating
Beach Villas
A coastal building shored from below while corroded steel joists were repaired, then balconies and walkways finished with a new coating.
-
01
SERPE-CO truck and trailer on site
-
02
Corrosion on the underside of the deck
-
03
Shoring placed under the steel Hambro joists
-
04
Ground floor cleared and laid out for shoring
-
05
New bolted connections on the steel
-
06
Joists shored and ready for repairs
-
07
Finished
Finished balcony with new coating
-
08
Finished
Second balcony coated and protected
-
09
Finished
Walkway coating complete
-
10
Corroded joists under the deck
-
11
Shoring in place across the ground floor
Exterior restoration on full scaffolding
The Moorings
A mid-rise condominium restored from frame scaffolding, with the work zone fenced and signed and the garage shored below.
-
01
Work zone fenced along the drive
-
02
Site protection around the entrance
-
03
Scaffold tower set at the roofline
-
04
Scaffold tower on the front elevation
-
05
Scaffold climbing the full height
-
06
Crew setting scaffold frames
-
07
Scaffold along the side elevation
-
08
Scaffold outside of the garage
-
09
Shoring set in the pool area
-
10
Garage shoring and protected work area
Parking garage repair and traffic coating
Edgewater
Garage ceiling repairs on a beachfront high-rise, followed by a new traffic coating across the parking level.
-
01
The building from the street
-
02
Garage shoring and structural column drop panel additions underway
-
03
Overhead forming of drop panel from the scaffold
-
04
Reinforcing exposed in the drop panel reinforcement
-
05
Rolling out the base coat
-
06
Crew spreading coating across the floor
-
07
Coating materials staged
-
08
Edgewater from the front
-
09
Textured traffic coating up close
-
10
Finished
Parking level coated end to end
-
11
Finished
Finished garage floor
Stair and walkway repair with new railings
Lighthouse Point Gardens
Concrete stairs and exterior walkways repaired on a two-story building, with old railings removed and new ones installed.
-
01
SERPE-CO trucks on site
-
02
Crew removing the old stair railing
-
03
Old steel railings coming out along the stair
-
04
Finished
Stair with new white aluminum railing installed
-
05
Stair treads repaired behind safety tape
-
06
Column chased for repair at the block wall
-
07
Walkway shored with repairs underway
Structural concrete and rebar repair
Old Port Cove, Harbor Village
Balcony slabs and beams opened up on scaffolding to expose corroded reinforcing, then repaired and rebuilt.
-
01
Site set up and staged
-
02
Scaffold on the front of the building
-
03
Equipment trailer and materials on site
-
04
Crew at work under the scaffold
-
05
Scaffold across the building
-
06
Damaged slab and beam opened up
-
07
Corroded reinforcing exposed
-
08
New reinforcing placed in the form
-
09
Welding at the slab edge
Request an estimate
Let's plan your restoration.
Tell us where the building is and what you are seeing. We set up a visit to the property, then send a written proposal, or tell you an engineer needs to write the scope first.
- More than 20 years in the field
- St. Lucie, Martin, Palm Beach, Broward and Miami-Dade
- Family-owned Certified General Contractor
Rather call?(954) 718-3094